CFR › Title 40 › Part 60 › §60.295340 CFR §60.2953Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkYou must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup.(a)The type(s) of waste to be burned.(b)The maximum design waste burning capacity.(c)The anticipated maximum charge rate.(d)If applicable, the petition for site-specific operating limits under § 60.2917.(e)The anticipated date of initial startup.