40 CFR §60.5110
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section.
- (a)Submit the final control plan that includes the four items described in paragraphs (a)(1) through (a)(4) of this section.
- (1)A description of the devices for air pollution control and process changes that you will use to comply with the emission limits and standards and other requirements of this subpart.
- (2)The type(s) of waste to be burned, if waste other than sewage sludge is burned in the unit.
- (3)The maximum design sewage sludge burning capacity.
- (4)If applicable, the petition for site-specific operating limits under § 60.5175.
- (b)Maintain an onsite copy of the final control plan.