40 CFR §63.1178
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)You must control emissions from each cupola as specified in Table 2 to this subpart.
- (b)You must meet the following operating limits for each cupola:
- (1)Begin within one hour after the alarm on a bag leak detection system sounds, and complete in a timely manner, corrective actions as specified in your operations, maintenance, and monitoring plan required by § 63.1187 of this subpart.
- (2)When the alarm on a bag leak detection system sounds for more than five percent of the total operating time in a six-month reporting period, develop and implement a written quality improvement plan (QIP) consistent with the compliance assurance monitoring requirements of § 64.8(b)-(d) of 40 CFR part 64.
- (3)Additionally, on or after the applicable compliance date for each new or reconstructed cupola, you must either:
- (i)Maintain the operating temperature of the incinerator so that the average operating temperature for each three-hour block period never falls below the average temperature established during the performance test, or
- (ii)Maintain the percent excess oxygen in the cupola at or above the level established during the performance test. You must determine the percent excess oxygen using the following equation: