40 CFR §63.7185
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)You must be in compliance with the requirements of § 63.7184 at all times, except during periods of startup, shutdown, or malfunction.
- (b)You must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in § 63.6(e)(1)(i).
- (c)You must develop a written startup, shutdown, and malfunction plan (SSMP). Your SSMP must be prepared in accordance with the provisions in § 63.6(e)(3).
- (d)You must perform all the items listed in paragraphs (d)(1) through (3) of this section: