40 CFR §792.31
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
For each study, testing facility management shall:
- (a)Designate a study director as described in § 792.33 before the study is initiated.
- (b)Replace the study director promptly if it becomes necessary to do so during the conduct of a study.
- (c)Assure that there is a quality assurance unit as described in § 792.35.
- (d)Assure that test, control, and reference substances or mixtures have been appropriately tested for identity, strength, purity, stability, and uniformity, as applicable.
- (e)Assure that personnel, resources, facilities, equipment, materials and methodologies are available as scheduled.
- (f)Assure that personnel clearly understand the functions they are to perform.
- (g)Assure that any deviations from these regulations reported by the quality assurance unit are communicated to the study director and corrective actions are taken and documented.