As stated in 63.9365, you must comply with the General Provisions in §§ 63.1 through 63.15 that apply to you according to the following table:

CitationSubjectApplicable to subpart PPPPPExplanation
§ 63.1(a)(1)-(12)General ApplicabilityYes
§ 63.1(b)(1)-(3)Initial Applicability DeterminationYesApplicability to subpart PPPPP is also specified in § 63.9285.
§ 63.1(c)(1)Applicability After Standard EstablishedYes
§ 63.1(c)(2)Applicability of Permit Program for Area SourcesNoArea sources are not subject to subpart PPPPP.
§ 63.1(c)(5)NotificationsYes
§ 63.1(c)(6)ApplicabilityReclassificationYes.
§ 63.1(d)[Reserved]
§ 63.1(e)Applicability of Permit Program Before Relevant Standard is SetYes
§ 63.2DefinitionsYesAdditional definitions are specified in § 63.9375.
§ 63.3Units and AbbreviationsYes
§ 63.4Prohibited Activities and CircumventionYes
§ 63.5(a)Construction/ReconstructionYes
§ 63.5(b)Requirements for Existing, Newly Constructed, and Reconstructed SourcesYes
§ 63.5(d)Application for Approval of Construction/ReconstructionYes
§ 63.5(e)Approval of Construction/ReconstructionYes
§ 63.5(f)Approval of Construction/Reconstruction based on Prior State ReviewYes
§ 63.6(a)Compliance With Standards and Maintenance Requirements-ApplicabilityYes
§ 63.6(b)(1)-(7)Compliance Dates for New and Reconstructed SourcesYes§ 63.9295 specifies the compliance dates.
§ 63.6(c)(1)-(2)Compliance Dates for Existing SourcesNoSubpart PPPPP does not establish standards for existing sources.
§ 63.6(c)(5)Compliance Dates for Existing SourcesYes§ 63.9295(b) specifies the compliance date if a new or reconstructed area source becomes a major source.
§ 63.6(e)(1)(i)Operation and MaintenanceYes before December 1, 2020. No on and after December 1, 2020See § 63.9305 for general duty requirement.
§ 63.6(e)(1)(ii)Operation and MaintenanceYes before December 1, 2020. No on and after December 1, 2020
§ 63.6(e)(1)(iii)Operation and MaintenanceYes
§ 63.6(e)(3)SSM PlanYes before December 1, 2020. No on and after December 1, 2020
§ 63.6(f)(1)Compliance Except During SSMYes before December 1, 2020. No on and after December 1, 2020
§ 63.6(f)(2)-(3)Methods for Determining ComplianceYes
§ 63.6(g)(1)-(3)Use of Alternative StandardsYes
§ 63.6(h)Compliance With Opacity/Visible Emission StandardsNoSubpart PPPPP does not establish opacity standards and does require continuous opacity monitoring systems (COMS).
§ 63.6(i)(1)-(16)Extension of ComplianceNoCompliance extension provisions apply to existing sources which do not have emission limitations in subpart PPPPP.
§ 63.6(j)Presidential Compliance ExemptionYes
§ 63.7(a)(1)-(2)Performance Test DatesYes
§ 63.7(a)(3)Performance Test Required By the AdministratorYes
§ 63.7(b)-(d)Performance Test Requirements-Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During TestingYes
§ 63.7(e)(1)Conditions for Conducting Performance TestsYes before December 1, 2020. No, see § 63.9321, on and after December 1, 2020
§ 63.7(e)(2)-(4)Conduct of Performance TestsYes
§ 63.7(f)Alternative Test MethodsYes
§ 63.7(g)-(h)Performance Testing Requirements-Data Analysis, Recordkeeping, Reporting, Waiver of TestYes
§ 63.8(a)(1)-(2)Monitoring Requirements—ApplicabilityYesSubpart PPPPP contains specific requirement for monitoring at § 63.9325.
§ 63.8(a)(4)Additional Monitoring RequirementsNoSubpart PPPPP does not have monitoring requirement for flares.
§ 63.8(b)Conduct of MonitoringYes
§ 63.8(c)(1)Continuous Monitoring System (CMS) Operation and MaintenanceYes
§ 63.8(c)(1)(i)General Duty to Minimize Emissions and CMS OperationYes before December 1, 2020. No on and after December 1, 2020
§ 63.8(c)(1)(ii)Operation and Maintenance of CMSYes
§ 63.8(c)(1)(iii)Requirement to Develop SSM Plan for CMSYes before December 1, 2020. No on and after December 1, 2020
§ 63.8(c)(2)-(3)Monitoring System InstallationYes
§ 63.8(c)(4)CMSNo§ 63.9335(a) and (b) specifies the requirements.
§ 63.8(c)(5)COMSNoSubpart PPPPP does not have opacity or VE standards.
§ 63.8(c)(6)-(8)CMS RequirementsYesExcept that subpart PPPPP does not require COMS.
§ 63.8(d)(1)-(2)CMS Quality ControlYes
§ 63.8(d)(3)CMS Quality ControlYes before December 1, 2020. No on and after December 1, 2020
§ 63.8(e)CMS PerformanceYesExcept for § 63.8(e)(5)(ii) which applies to COMS.
§ 63.8(f)(1)-(5)Alternative Monitoring MethodYes
§ 63.8(f)(6)Alternative to Relative Accuracy TestYes
§ 63.8(g)Data ReductionYes before December 1, 2020. No on and after December 1, 2020§§ 63.9335 and 63.9340 specify monitoring data reduction.
§ 63.9(a)-(b)Notification RequirementsYes
§ 63.9(c)Request for Compliance ExtensionNoCompliance extension to not apply to new or reconstructed sources.
§ 63.9(d)Notification of Special Compliance Requirements for New SourcesYes
§ 63.9(e)Notification of Performance TestNoSubpart PPPPP does not require performance testing.
§ 63.9(f)Notification of Opacity/VE testNoSubpart PPPPP does not have opacity/VE standards.
§ 63.9(g)(1)Additional Notifications When Using CMSYes
§ 63.9(g)(2)Additional Notifications When Using CMSNoSubpart PPPPP does not have opacity/VE standards.
§ 63.9(g)(3)Additional Notifications When Using CMSYes
§ 63.9(h)Notification of Compliance StatusYes
§ 63.9(i)Adjustment of Submittal DeadlinesYes
§ 63.9(j)Change in Previous InformationYes
§ 63.9(k)NotificationsElectronic reporting proceduresYes, only as specified in § 63.9(j).
§ 63.10(a)Recordkeeping/ReportingYes
§ 63.10(b)(1)General Recordkeeping RequirementsYes
§ 63.10(b)(2)(i)Recordkeeping of Occurrence and Duration of Startups and ShutdownsYes before December 1, 2020. No on and after December 1, 2020
§ 63.10(b)(2)(ii)Recordkeeping of Occurrence and Duration of MalfunctionsYes before December 1, 2020. No on and after December 1, 2020See § 63.9355 for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
§ 63.10(b)(2)(iii)Recordkeeping of Maintenance on Controls and Monitoring EquipmentYes
§ 63.10(b)(2)(iv)-(v)Actions Taken to Minimize Emissions During SSMYes before December 1, 2020. No on and after December 1, 2020
§ 63.10(b)(2)(vi)-(xi)CMS RecordsYes
§ 63.10(b)(2)(xii)RecordsYes
§ 63.10(b)(2)(xiii)RecordsYes
§ 63.10(b)(2)(xiv)RecordsYes
§ 63.10(b)(3)Recordkeeping for Applicability DeterminationsYes
§ 63.10(c)(1)-(6), (9)-(14)Additional Recordkeeping for CMSYes
§ 63.10(c)(7)-(8)Records of Excess Emissions and Parameter Monitoring Exceedances for CMSNoSpecific language is located at § 63.9355 of subpart PPPPP.
§ 63.10(c)(15)Records Regarding the SSM PlanYes before December 1, 2020. No on and after December 1, 2020
§ 63.10(d)(1)General Reporting RequirementsYes
§ 63.10(d)(2)Report of Performance Test ResultsYes
§ 63.10(d)(3)Reporting of Opacity or VE ObservationsNoSubpart PPPPP does not have opacity/VE standards.
§ 63.10(d)(4)Progress Reports for Sources with Compliance ExtensionsNoCompliance extensions do not apply to new or reconstructed sources.
§ 63.10(d)(5)SSM ReportsYes before December 1, 2020. No on and after December 1, 2020On and after December 1, 2020, see § 63.9350 for malfunction reporting requirements.
§ 63.10(e)(1) and (2)(i)Additional CMS ReportsYes
§ 63.10(e)(2)(ii)Additional CMS ReportsNoSubpart PPPPP does not require COMS.
§ 63.10(e)(3)Excess Emissions/CMS Performance ReportsNoSpecific language in located in § 63.9350 of subpart PPPPP.
§ 63.10(e)(4)COMS Data ReportsNoSubpart PPPPP does not require COMS.
§ 63.10(f)Waiver for Recordkeeping/ReportingYes
§ 63.11Control Device Requirements/FlaresNoSubpart PPPPP does not specify use of flares for compliance.
§ 63.12State Authority and DelegationsYes
§ 63.13AddressesYes
§ 63.14Incorporation by ReferenceYesASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference—See § 63.14).
§ 63.15Availability of Information/ConfidentialityYes