43 CFR §418.17
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Project water must be managed to make maximum use of Carson River water and to minimize diversions of Truckee River water through the Truckee Canal. This will make available as much Truckee River water as possible for use in the lower Truckee River and Pyramid Lake.