Part 418 — Operating Criteria and Procedures for the Newlands Reclamation Project, Nevada
- § 418.1— Definitions.
- § 418.2— How Project water may be used.
- § 418.3— Effect of these regulations on water rights.
- § 418.4— Prohibited deliveries.
- § 418.5— Responsibility for violations.
- § 418.6— Fallon Paiute-Shoshone Indian Reservation.
- § 418.7— Who may receive irrigation deliveries.
- § 418.8— Types of eligible land.
- § 418.9— Reporting changes in eligible land.
- § 418.10— Determining the amount of water duty to be delivered.
- § 418.11— Valid headgate deliveries.
- § 418.12— Project efficiency.
- § 418.13— Maximum allowable limits.
- § 418.14— Recordkeeping requirements.
- § 418.15— Operations monitoring.
- § 418.16— Using water for power generation.
- § 418.17— Truckee and Carson River water use.
- § 418.18— Diversions at Derby Dam.
- § 418.19— Diversions from the Truckee River to the Truckee Division.
- § 418.20— Diversions from the Truckee River to Lahontan Reservoir, January through June.
- § 418.21— Diversion of Truckee River water to Lahontan Reservoir, July through December.
- § 418.22— Future adjustments to Lahontan Reservoir storage targets.
- § 418.23— Diversion of Rock Dam Ditch water.
- § 418.24— Precautionary drawdown and spills from Lahontan Reservoir.
- § 418.25— Water use for other than Newlands Project purposes.
- § 418.26— Charges for water use.
- § 418.27— Distribution system operation.
- § 418.28— Conditions of delivery.
- § 418.29— Project management.
- § 418.30— Provisions required in future contracts.
- § 418.31— Conservation measures.
- § 418.32— Cooperative programs.
- § 418.33— Purpose of the implementation strategy.
- § 418.34— Valid headgate deliveries.
- § 418.35— Efficiencies.
- § 418.36— Incentives for additional long term conservation.
- § 418.37— Disincentives for lower efficiency.
- § 418.38— Maximum allowable diversion.