CFR › Title 46 › Part 109 › §109.55546 CFR §109.555Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkThe master or person in charge and the engineer in charge shall ensure that—(a)Steam pressure does not exceed that allowed by the certificate of inspection; and(b)The safety valves, once set, are not tampered with or made inoperative.