46 CFR §148.275
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Before spent iron oxide or spent iron sponge is loaded in a closed hold, the shipper must give the master a written certification that the material has been cooled and weathered for at least eight weeks.
- (b)Both spent iron oxide and spent iron sponge may be transported on open hold all-steel barges after exposure to air for a period of at least ten days.