46 CFR §153.1500
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The master shall ensure that a relief valve exposed to a cargo after the failure of a rupture disk or breaking pin is cleaned and operates properly before the next cargo is loaded into the tank.