StacksVerified U.S. regulatory reference

46 CFR §153.209

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Bilge pumping systems for cargo pumprooms, slop tanks, and void spaces separated from cargo tanks by only a single bulkhead must be entirely within the locations allowed containment systems in § 153.234.