46 CFR §153.554
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
When Table 1 refers to this section:
- (a)Each containment system loading and discharge connection must have a spray shield;
- (b)Each cargo containment system must be separated from bunkers by double walls, such as a cofferdam and piping tunnels; and
- (c)Each vessel must have on board a means to determine whether cargo has leaked into the spaces adjacent to a cargo containment system.