StacksVerified U.S. regulatory reference

46 CFR §153.983

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Upon completion of the transfer operation, the person in charge of cargo transfer shall ensure that:
  1. (a)The cargo transfer connections are closed off;
  2. (b)The transfer lines and hoses are drained of cargo, either into the tank or back to the transfer terminal;
  3. (c)Any electrical bonding between the vessel and the shore facility is broken only after the cargo hose is disconnected and all spills removed; and
  4. (d)Each vent system is returned to its nonloading configuration.