46 CFR §159.005-9
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each manufacturer of equipment or material that is required to be subjected to approval inspections and tests must—
- (1)If the applicable subpart requires the equipment or material to be inspected or tested, have the approval inspections or tests performed;
- (2)If the applicable subpart requires the equipment or material to be inspected or tested by an independent laboratory, insure that a laboratory accepted by the Commandant performs or supervises the approval inspections or tests;
- (3)Bear all costs of the approval inspections and tests;
- (4)If requested, advise the Commandant of the time, date, and place of each approval inspection or test, or both, before the inspection or test is performed; and
- (5)After completion of the approval inspections and tests, submit to the Commandant—
- (i)A test report that meets § 159.005-11;
- (ii)At least two sets of specifications of the material as inspected or tested or at least two sets of plans of the equipment as inspected or tested that meet § 159.005-12; and
- (iii)A description of the quality control procedures that will be in effect during the production of the equipment or material.
- (b)[Reserved]