StacksVerified U.S. federal law reference

46 CFR §160.045-23 — -23 Procedure for approval of design or material change.

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory for approval before changing throwable PFD production methods.
  2. (b)Determinations of equivalence of design, construction, and materials may be made only by the Commandant or a designated representative.