StacksVerified U.S. federal law reference

46 CFR §160.060-23 — -23 Procedure for approval of design or material change.

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
  1. (a)The manufacturer must submit any proposed changes in design, material, or construction to typeapproval@uscg.mil for approval before changing PFD production methods.
  2. (b)Only the Commandant or a designated representative may make determinations of equivalence of design, construction, and materials.