46 CFR §160.066-11
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Red aerial pyrotechnic flare distress signals are approved under the procedures of subpart 159.005 of this chapter.
- (b)The manufacturer must produce a lot of at least 100 signals from which samples for approval testing must be drawn. Approval testing must be conducted in accordance with the operational tests in § 160.066-12 and the technical tests in § 160.066-13. In order for the signal to be approved, the samples must pass both the operational and the technical tests.
- (c)The approval tests must be performed by an independent laboratory accepted by the Commandant under Subpart 159.010 of this chapter.