46 CFR §160.076-17
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory and the Commandant for approval before changing PFD production methods.
- (b)Determinations of equivalence of design, construction, and materials may be made only by the Commandant or a designated representative.