CFR › Title 46 › Part 173 › §173.00746 CFR §173.007Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkWhen doing the calculations required in this subpart, the hook load must be considered to be located at the head of the crane.