- (a)The diving supervisor shall insure that—
- (1)Each breathing supply hose is pressure tested prior to being placed into initial service and every 24 months thereafter to 1.5 times its maximum working pressure;
- (2)Each breathing supply hose assembly, prior to being placed into initial service and after any repair, modification, or alteration, is tensile tested by—
- (3)Each breathing supply hose is periodically checked for—
- (4)The open ends of each breathing supply hose are taped, capped, or plugged when not in use.
- (b)To meet the requirements of paragraph (a)(3) of this section, each breathing supply hose must be—