46 CFR §272.25
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Repayment of M&R subsidy for compensated marine or other loss. If an Operator eventually receives compensation from an insurer or any other person for a marine loss or any other loss for which M&R subsidy has been paid, the Operator shall repay to MARAD an amount equal to the amount of subsidy paid with respect to that loss.
- (b)Repayment of M&R subsidy for Improvements—three year service requirement. If, within three years after the completion of an Improvement for which M&R subsidy was paid, the Operator permanently withdraws the Eligible Vessel from the ODSA, the Operator shall repay to MARAD an amount equal to the amount of M&R subsidy paid with respect to that Improvement unless MARAD shall have determined that such action was beyond the control of the Operator.
- (c)Repayment of M&R subsidy due to allocation of costs. If the allocation of total M&R costs required by § 272.41(e) of this part results in the allocation of a lesser amount of subsidizable M&R costs than were actually paid for during the calendar year, the Operator shall repay to MARAD the amount of ODS which was paid in excess of the allocated subsidizable costs.
- (d)Administrative action. If an Operator fails to repay an M&R subsidy required to be repaid by this section, MARAD may either reduce any ODS payable by the amount of M&R subsidy required to be repaid by this section, or take any other action necessary to secure repayment.