CFR › Title 46 › Part 32 › §32.50-546 CFR §32.50-5Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy link(a)[Reserved](b)A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls.