46 CFR §404.109
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The Director calculates revised base rates for each area by dividing the initial base rate (from Step 7) by the average weighting factor (from Step 8) to produce a revised base rate for each area.