StacksVerified U.S. regulatory reference

46 CFR §45.5

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
For the purposes of the law and regulations prohibiting submergence of load lines (46 U.S.C. 88c; 46 CFR 42.07-10), the fresh water and salt water load lines marked under this part apply during the following seasons:
  1. (a)Summer load lines apply April 16 through April 30 and September 16 through September 30.
  2. (b)Except for hopper dredges operating at working freeboards in accordance with subpart C of part 44 of this chapter, the Assigning Authority may not allow for lesser freeboards.
  3. (c)Intermediate load lines apply October 1 through October 31 and April 1 through April 15.
  4. (d)Winter load lines apply November 1 through March 31.