46 CFR §62.20-1
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The following plans must be submitted to the Coast Guard for approval in accordance with §§ 50.20-5 and 50.20-10 of this chapter:
- (1)A general arrangement plan of control and monitoring equipment, control locations, and the systems served.
- (2)Control and monitoring console, panel, and enclosure layouts.
- (3)Schematic or logic diagrams including functional relationships, a written description of operation, and sequences of events for all modes of operation.
- (4)A description of control or monitoring system connections to non-vital systems.
- (5)A description of programmable features.
- (6)A description of built-in test features and diagnostics.
- (7)Design Verification and Periodic Safety test procedures described in subpart 61.40 of this subchapter.
- (8)Control system normal and emergency operating instructions.
- (b)[Reserved]