CFR › Title 46 › Part 64 › §64.5546 CFR §64.55Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkA pressure relief device must be located on an MPT in a place that—(a)Is the highest practical point of the tank; and(b)Allows direct communication with the vapor space.