46 CFR §64.81
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The 30-month inspection of an MPT required in § 64.77(b) must include—
- (b)If the tank passes the inspection required in paragraph (a) of this section, the owner or his representative may stencil the date of the inspection on the MPT near the metal identification plate that is required in § 64.53 in durable and legible letters that are 1 1/4 inch in height or larger.