StacksVerified U.S. regulatory reference

46 CFR §64.93

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)A pressure gauge must be installed—
    1. (1)On the pump discharge;
    2. (2)Near the pump controls; and
    3. (3)Visible to the operator.
  2. (b)A pump must have a remote, quick acting, manual shutdown that is conspicuously labeled and located in an easily accessible area away from the pump. The quick acting, manual shutdown for remote operation must provide a means of stopping the pump power unit.