48 CFR §1425.202
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)
- (1)The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.
- (2)The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.
- (3)For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.
- (b)[Reserved]