StacksVerified U.S. regulatory reference

48 CFR §236.604

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Prepare a separate performance evaluation after actual construction of the project. Ordinarily, the evaluating official should be the person most familiar with the architect-engineer contractor's performance.