48 CFR §247.270-2
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all phases of stevedoring operations.
- (b)When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.