StacksVerified U.S. regulatory reference

48 CFR §925.202

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)
    1. (2)Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.