49 CFR §195.302
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Except as otherwise provided in this section and in § 195.305(b), no operator may operate a pipeline unless it has been pressure tested under this subpart without leakage. In addition, no operator may return to service a segment of pipeline that has been replaced, relocated, or otherwise changed until it has been pressure tested under this subpart without leakage.
- (b)Except for pipelines converted under § 195.5, the following pipelines may be operated without pressure testing under this subpart:
- (1)Any hazardous liquid pipeline whose maximum operating pressure is established under § 195.406(a)(5) that is—
- (2)Any carbon dioxide pipeline constructed before July 12, 1991, that—
- (3)Any low-stress pipeline constructed before August 11, 1994 that does not transport HVL.
- (4)Those portions of older hazardous liquid and carbon dioxide pipelines for which an operator has elected the risk-based alternative under § 195.303 and which are not required to be tested based on the risk-based criteria.
- (c)Except for pipelines that transport HVL onshore, low-stress pipelines, and pipelines covered under § 195.303, the following compliance deadlines apply to pipelines under paragraphs (b)(1) and (b)(2)(i) of this section that have not been pressure tested under this subpart: