49 CFR §213.122
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Except as a temporary repair in emergency situations no rail having a torch cut end shall be used in Classes 3 through 5 track. When a rail end is torch cut in emergency situations, train speed over that rail end shall not exceed the maximum allowable for Class 2 track. For existing torch cut rail ends in Classes 3 through 5 track the following shall apply—
- (1)Within one year of September 21, 1998, all torch cut rail ends in Class 5 track shall be removed;
- (2)Within two years of September 21, 1998, all torch cut rail ends in Class 4 track shall be removed; and
- (3)Within one year of September 21, 1998, all torch cut rail ends in Class 3 track over which regularly scheduled passenger trains operate, shall be inventoried by the track owner.
- (b)Following the expiration of the time limits specified in paragraphs (a)(1), (2), and (3) of this section, any torch cut rail end not removed from Classes 4 and 5 track, or any torch cut rail end not inventoried in Class 3 track over which regularly scheduled passenger trains operate, shall be removed within 30 days of discovery. Train speed over that rail end shall not exceed the maximum allowable for Class 2 track until removed.