StacksVerified U.S. regulatory reference

50 CFR §29.97

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
If you are proposing to produce a well, you must submit the information requested on FWS Form 3-2469, including, but not limited to:
  1. (a)The dimensions and the to-scale layout of the well pad, clearly identifying well locations, noting partial reclamation areas; gathering, separation, metering, and storage equipment; electrical lines; fences; spill control equipment or structures, including lined areas, artificial lift equipment, tank batteries, treating and separating vessels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pickup points; gas compressor, including size and type (if applicable); and any other well site equipment.
  2. (b)A general description of anticipated stimulations, servicing, and workovers.
  3. (c)A description of the procedures and equipment used to maintain well control.
  4. (d)A description of the method and means used to transport produced oil and gas, including vehicular transport; flowline and gathering line construction and operation, pipe size, and operating pressure; cathodic protection methods; surface equipment use; surface equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shutdown procedures.
  5. (e)A road and well pad maintenance plan, including equipment and materials to maintain the road surface and control erosion.
  6. (f)A vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, including control of noxious and invasive species.
  7. (g)A stormwater management plan on the well site.
  8. (h)A produced water storage and disposal plan.
  9. (i)A description of the equipment, materials, and procedures proposed for well plugging.