50 CFR §29.97
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
If you are proposing to produce a well, you must submit the information requested on FWS Form 3-2469, including, but not limited to:
- (a)The dimensions and the to-scale layout of the well pad, clearly identifying well locations, noting partial reclamation areas; gathering, separation, metering, and storage equipment; electrical lines; fences; spill control equipment or structures, including lined areas, artificial lift equipment, tank batteries, treating and separating vessels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pickup points; gas compressor, including size and type (if applicable); and any other well site equipment.
- (b)A general description of anticipated stimulations, servicing, and workovers.
- (c)A description of the procedures and equipment used to maintain well control.
- (d)A description of the method and means used to transport produced oil and gas, including vehicular transport; flowline and gathering line construction and operation, pipe size, and operating pressure; cathodic protection methods; surface equipment use; surface equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shutdown procedures.
- (e)A road and well pad maintenance plan, including equipment and materials to maintain the road surface and control erosion.
- (f)A vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, including control of noxious and invasive species.
- (g)A stormwater management plan on the well site.
- (h)A produced water storage and disposal plan.
- (i)A description of the equipment, materials, and procedures proposed for well plugging.