(a)
(1) Except as provided under paragraph (2), in this chapter, the term "major defense acquisition program" means a Department of Defense acquisition program that is not a highly sensitive classified program (as determined by the Secretary of Defense) and—
(A) that is designated by the Secretary of Defense as a major defense acquisition program; or
(B) in the case of a program that is not a program for the acquisition of an automated information system (either a product or a service), that is estimated by the Secretary of Defense to require an eventual total expenditure for research, development, test, and evaluation of more than $300,000,000 (based on fiscal year 1990 constant dollars) or an eventual total expenditure for procurement, including all planned increments or spirals, of more than $1,800,000,000 (based on fiscal year 1990 constant dollars).
(2) In this chapter, the term "major defense acquisition program" does not include—
(A) an acquisition program or project that is carried out using the rapid fielding or rapid prototyping acquisition pathway under section 804 of the National Defense Authorization Act for Fiscal Year 2016 (Public Law 114–92; 10 U.S.C. 2302 note); or
(B) an acquisition program for a defense business system (as defined in section 2222(i)(1) of this title) carried out using the acquisition guidance issued pursuant to section 883(e) of the National Defense Authorization Act for Fiscal Year 2016 (Public Law 114–92; 10 U.S.C. 2223a note).
(b) The Secretary of Defense may adjust the amounts (and the base fiscal year) provided in subsection (a)(1)(B) on the basis of Department of Defense escalation rates. An adjustment under this subsection shall be effective after the Secretary transmits a written notification of the adjustment to the Committee on Armed Services of the Senate and the Committee on Armed Services of the House of Representatives.
(c) For purposes of subsection (a)(1)(B), the Secretary shall consider, as applicable, the following:
(1) The estimated level of resources required to fulfill the relevant joint military requirement, as determined by the Joint Requirements Oversight Council pursuant to section 181 of this title.
(2) The cost estimate referred to in section 2366a(a)(6) of this title.
(3) The cost estimate referred to in section 2366b(a)(1)(C) of this title.
(4) The cost estimate within a baseline description as required by section 2435 of this title.
(d)
(1) The milestone decision authority for a major defense acquisition program reaching Milestone A after October 1, 2016, shall be the service acquisition executive of the military department that is managing the program, unless the Secretary of Defense designates, under paragraph (2), another official to serve as the milestone decision authority.
(2) The Secretary of Defense may designate an alternate milestone decision authority for a program with respect to which—
(A) subject to paragraph (5), the Secretary determines that the program is addressing a joint requirement;
(B) the Secretary determines that the program is best managed by a Defense Agency;
(C) the program has incurred a unit cost increase greater than the significant cost threshold or critical cost threshold under section 2433 of this title;
(D) the program is critical to a major interagency requirement or technology development effort, or has significant international partner involvement; or
(E) the Secretary determines that an alternate official serving as the milestone decision authority will best provide for the program to achieve desired cost, schedule, and performance outcomes.
(3)
(A) After designating an alternate milestone decision authority under paragraph (2) for a program, the Secretary of Defense may revert the position of milestone decision authority for the program back to the service acquisition executive upon request of the Secretary of the military department concerned. A decision on the request shall be made within 180 days after receipt of the request from the Secretary of the military department concerned.
(B) If the Secretary of Defense denies the request for reversion of the milestone decision authority back to the service acquisition executive, the Secretary shall report to the congressional defense committees on the basis of the Secretary's decision that an alternate official serving as milestone decision authority will best provide for the program to achieve desired cost, schedule, and performance outcomes. No such reversion is authorized after a program has incurred a unit cost increase greater than the significant cost threshold or critical cost threshold under section 2433 of this title, except in exceptional circumstances.
(4)
(A) For each major defense acquisition program, the Secretary of the military department concerned and the Chief of the armed force concerned shall, in each Selected Acquisition Report required under section 2432 of this title, certify that program requirements are stable and funding is adequate to meet cost, schedule, and performance objectives for the program and identify and report to the congressional defense committees on any increased risk to the program since the last report.
(B) The Secretary of Defense shall review the acquisition oversight process for major defense acquisition programs and shall limit outside requirements for documentation to an absolute minimum on those programs where the service acquisition executive of the military department that is managing the program is the milestone decision authority and ensure that any policies, procedures, and activities related to oversight efforts conducted outside of the military departments with regard to major defense acquisition programs shall be implemented in a manner that does not unnecessarily increase program costs or impede program schedules.
(5) The authority of the Secretary of Defense to designate an alternative milestone decision authority for a program with respect to which the Secretary determines that the program is addressing a joint requirement, as set forth in paragraph (2)(A), shall apply only for a major defense acquisition program that reaches Milestone A after October 1, 2016, and before October 1, 2019.
Amendments
2017—Subsec. (a)(1)(B). Pub. L. 115–91, §831(1), inserted "in the case of a program that is not a program for the acquisition of an automated information system (either a product or a service)," after "(B)".
Subsec. (a)(2). Pub. L. 115–91, §831(2)(A), substituted "include—" for "include", inserted subpar. (A) designation before "an acquisition program", and added subpar. (B).
Subsecs. (b), (c). Pub. L. 115–91, §1081(a)(38), substituted "subsection (a)(1)(B)" for "subsection (a)(2)".
2016—Subsec. (a). Pub. L. 114–328, §847(a), designated existing provisions as par. (1), substituted "Except as provided under paragraph (2), in this chapter" for "In this chapter", redesignated former pars. (1) and (2) as subpars. (A) and (B), respectively, of par. (1), and added par. (2).
Subsec. (d)(2)(A). Pub. L. 114–328, §807(b)(1), inserted "subject to paragraph (5)," before "the Secretary determines".
Subsec. (d)(5). Pub. L. 114–328, §807(b)(2), added par. (5).
2015—Subsec. (d). Pub. L. 114–92 added subsec. (d).
2014—Subsec. (c)(2). Pub. L. 113–291 substituted "section 2366a(a)(6)" for "section 2366a(a)(4)".
2009—Subsec. (a)(2). Pub. L. 111–23, §206(b)(1), inserted ", including all planned increments or spirals," after "an eventual total expenditure for procurement".
Subsec. (c). Pub. L. 111–23, §206(b)(2), added subsec. (c).
1999—Subsec. (b). Pub. L. 106–65 substituted "and the Committee on Armed Services" for "and the Committee on National Security".
1996—Subsec. (b). Pub. L. 104–106 substituted "Committee on Armed Services of the Senate and the Committee on National Security of the House of Representatives" for "Committees on Armed Services of the Senate and House of Representatives".
1992—Pub. L. 102–484 designated existing provisions as subsec. (a), in par. (2) substituted "$300,000,000" for "$200,000,000", "1990" for "1980" in two places, and "$1,800,000,000" for "$1,000,000,000", and added subsec. (b).
Effective Date of 2016 Amendment
Pub. L. 114–328, div. A, title VIII, §807(b), Dec. 23, 2016, 130 Stat. 2261, provided that the amendment made by section 807(b) is effective January 1, 2017.
Effective Date of 2015 Amendment
Pub. L. 114–92, div. A, title VIII, §825(c)(3), Nov. 25, 2015, 129 Stat. 908, provided that: "The amendments made by subsections (a) and (b) [amending this section and section 133 of this title] shall take effect on October 1, 2016."
Fire Suppressant and Fuel Containment Standards for Certain Vehicles
Pub. L. 114–328, div. A, title I, §142, Dec. 23, 2016, 130 Stat. 2040, directed the Secretary of the Army and the Secretary of the Navy to issue guidance regarding fire suppressant and fuel containment standards for covered vehicles of the Army and of the Marine Corps, respectively, and to submit to the congressional defense committees, no later than 180 days after Dec. 23, 2016, reports on such guidance.
Implementation of Procedures for Designation of Milestone Decision Authorities
Pub. L. 114–92, div. A, title VIII, §825(c)(1), (2), Nov. 25, 2015, 129 Stat. 908, directed the Secretary of Defense to submit to the congressional defense committees, no later than 180 days after Nov. 25, 2015, a plan for implementing procedures for designation of milestone decision authorities under subsection (d) of this section and directed the Deputy Chief Management Officer of the Department of Defense, in consultation with the Under Secretary of Defense for Acquisition, Technology, and Logistics and the service acquisition executives, to issue guidance to ensure that by no later than Oct. 1, 2016, the acquisition policy, guidance, and practices of the Department of Defense conform to the requirements of subsec. (d) of this section.
Tenure and Accountability of Program Managers for Program Definition Periods
Pub. L. 114–92, div. A, title VIII, §826, Nov. 25, 2015, 129 Stat. 908, as amended by Pub. L. 114–328, div. A, title VIII, §862(a), Dec. 23, 2016, 130 Stat. 2302; Pub. L. 116–92, div. A, title IX, §902(64), Dec. 20, 2019, 133 Stat. 1550, provided that:
"(a)
"(b)
"(c)
"(1) bringing technologies to maturity and identifying the manufacturing processes that will be needed to carry out the program;
"(2) ensuring continuing focus during program development on meeting stated mission requirements and other requirements of the Department of Defense;
"(3) recommending trade-offs between program cost, schedule, and performance for the life-cycle of the program;
"(4) developing a business case for the program; and
"(5) ensuring that appropriate information is available to the milestone decision authority to make a decision on Milestone B approval (or Key Decision Point B approval in the case of a space program), including information necessary to make the certification required by section 2366a of title 10, United States Code.
"(d)
"(1) has the appropriate management, engineering, technical, and financial expertise needed to meet the responsibilities assigned pursuant to subsection (c);
"(2) is provided the resources and support (including systems engineering expertise, cost-estimating expertise, and software development expertise) needed to meet such responsibilities; and
"(3) is assigned to the program manager position for such program until such time as such program receives Milestone B approval (or Key Decision Point B approval in the case of a space program), unless removed for cause or due to exceptional circumstances.
"(e)
Tenure and Accountability of Program Managers for Program Execution Periods
Pub. L. 114–92, div. A, title VIII, §827, Nov. 25, 2015, 129 Stat. 909, as amended by Pub. L. 114–328, div. A, title VIII, §862(b), Dec. 23, 2016, 130 Stat. 2302; Pub. L. 116–92, div. A, title IX, §902(65), Dec. 20, 2019, 133 Stat. 1550, provided that:
"(a)
"(b)
"(c)
"(1) require the program manager for the program execution period of a major defense acquisition program to enter into a performance agreement with the manager's immediate supervisor for such program within six months of assignment, that—
"(A) establishes expected parameters for the cost, schedule, and performance of the program consistent with the business case for the program;
"(B) provides the commitment of the supervisor to provide the level of funding and resources required to meet such parameters; and
"(C) provides the assurance of the program manager that such parameters are achievable and that the program manager will be accountable for meeting such parameters; and
"(2) provide the program manager with the authority to—
"(A) consult on the addition of new program requirements that would be inconsistent with the parameters established in the performance agreement entered into pursuant to paragraph (1);
"(B) recommend trade-offs between cost, schedule, and performance, provided that such trade-offs are consistent with the parameters established in the performance agreement entered into pursuant to paragraph (1); and
"(C) develop such interim goals and milestones as may be required to achieve the parameters established in the performance agreement entered into pursuant to paragraph (1).
"(d)
"(1) has the appropriate management, engineering, technical, and financial expertise needed to meet the responsibilities assigned pursuant to subsection (c);
"(2) is provided the resources and support (including systems engineering expertise, cost estimating expertise, and software development expertise) needed to meet such responsibilities; and
"(3) is assigned to the program manager position for such program during the program execution period, unless removed for cause or due to exceptional circumstances.
"(e)
Penalty for Cost Overruns
Pub. L. 114–92, div. A, title VIII, §828, Nov. 25, 2015, 129 Stat. 910, as amended by Pub. L. 115–91, div. A, title VIII, §825, Dec. 12, 2017, 131 Stat. 1466; Pub. L. 115–232, div. A, title X, §1081(d), Aug. 13, 2018, 132 Stat. 1986; Pub. L. 116–92, div. A, title VIII, §805(a), (b)(2), Dec. 20, 2019, 133 Stat. 1485, provided that:
"(a)
"(b)
"(1) The amount of the cost overrun on any major defense acquisition program or subprogram in a fiscal year is the difference between the current program acquisition unit cost for the program or subprogram and the program acquisition unit cost for the program as shown in the original Baseline Estimate for the program or subprogram, multiplied by the quantity of items to be purchased under the program or subprogram, as reported in the final Selected Acquisition Report for the fiscal year in accordance with section 2432 of title 10, United States Code.
"(2) Cost overruns for covered major defense acquisition programs that are joint programs of more than one military department shall be allocated among the military departments in percentages determined by the Under Secretary of Defense for Acquisition and Sustainment.
"(3) The cumulative amount of cost overruns for a military department in a fiscal year is the sum of the cost overruns for all covered major defense acquisition programs of the department in the fiscal year (including cost overruns allocated to the military department in accordance with paragraph (2)).
"(4) The cost overrun penalty for a military department in a fiscal year is three percent of the cumulative amount of cost overruns of the military department in the fiscal year, as determined pursuant to paragraph (3).
"(c)
"(d)
"(1)
"(2)
"(3)
"(e)
[Pub. L. 115–91, div. A, title VIII, §825(b), Dec. 12, 2017, 131 Stat. 1466, which provided that the requirements of section 828 of Pub. L. 114–92, as in effect on the day before Dec. 12, 2017, would continue to apply with respect to fiscal years beginning on or before Oct. 1, 2016, was repealed by Pub. L. 116–92, div. A, title VIII, §805(b)(1), Dec. 20, 2019, 133 Stat. 1485.]
Improving Analytic Support to Systems Acquisition and Allocation of Acquisition, Intelligence, Surveillance and Reconnaissance Assets
Pub. L. 113–291, div. A, title X, §1058, Dec. 19, 2014, 128 Stat. 3501, which required the Secretary to review guidance on improving analytic support to systems acquisition and allocation of acquisition, intelligence, surveillance and reconnaissance assets, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(36), Aug. 13, 2018, 132 Stat. 1849.
Limitation on use of Cost-Type Contracts
Pub. L. 112–239, div. A, title VIII, §811, Jan. 2, 2013, 126 Stat. 1828, as amended by Pub. L. 116–92, div. A, title IX, §902(66), Dec. 20, 2019, 133 Stat. 1550, provided that:
"(a)
"(b)
"(1)
"(2)
"(c)
"(1)
"(2)
"(3)
"(A) means a prime contract for the production of a major defense acquisition program; and
"(B) does not include individual line items for segregable efforts or contracts for the incremental improvement of systems that are already in production (other than contracts for major upgrades that are themselves major defense acquisition programs).
"(d)
Estimates of Potential Termination Liability of Contracts for the Development or Production of Major Defense Acquisition Programs
Pub. L. 112–239, div. A, title VIII, §812, Jan. 2, 2013, 126 Stat. 1829, directed the Under Secretary of Defense for Acquisition, Technology, and Logistics to review, not later than 180 days after Jan. 2, 2013, relevant acquisition guidance and ensure that program managers for major defense acquisition programs are preparing estimates of potential termination liability for certain covered contracts and directed the Comptroller General of the United States to submit to the congressional defense committees, not later than 270 days after Jan. 2, 2013, a report on the extent to which the Department of Defense is considering potential termination liability as a factor in entering into and in terminating covered contracts.
Assessment, Management, and Control of Operating and Support Costs for Major Weapon Systems
Pub. L. 112–81, div. A, title VIII, §832, Dec. 31, 2011, 125 Stat. 1504, as amended by Pub. L. 112–239, div. A, title X, §1076(a)(12), Jan. 2, 2013, 126 Stat. 1948, which required guidance and maintenance of a database on operating and support costs for major weapon systems, was repealed by Pub. L. 115–91, div. A, title VIII, §836(b)(1), Dec. 12, 2017, 131 Stat. 1473. See section 2337a of this title.
Management of Manufacturing Risk in Major Defense Acquisition Programs
Pub. L. 111–383, div. A, title VIII, §812, Jan. 7, 2011, 124 Stat. 4264, as amended by Pub. L. 112–81, div. A, title VIII, §834, Dec. 31, 2011, 125 Stat. 1506, directed the Secretary of Defense to issue, not later than 180 days after Jan. 7, 2011, comprehensive guidance on the management of manufacturing risk in major defense acquisition programs and to ensure that the acquisition workforce chapter of the annual strategic workforce plan required by former section 115b of this title included an assessment of the critical manufacturing readiness knowledge and skills needed in the acquisition workforce and a plan of action for addressing any gaps in such knowledge and skills.
Developmental Test and Evaluation and Systems Engineering in the Military Departments and Defense Agencies
Pub. L. 111–23, title I, §102(b), May 22, 2009, 123 Stat. 1714, as amended by Pub. L. 111–383, div. A, title VIII, §813(a), title IX, §901(l)(1), Jan. 7, 2011, 124 Stat. 4265, 4326, provided for the development and implementation of plans to ensure the military department or Defense Agency concerned has appropriate resources and adequate numbers of trained personnel for developmental testing organizations and development planning and systems engineering organizations and provided for the submission of an annual report on the implementation of such plans, beginning no later than 180 days after May 22, 2009, and continuing from 2011 to 2014 and required an annual assessment of the reports from 2010 to 2014.
Performance Assessments and Root Cause Analyses for Major Defense Acquisition Programs
Pub. L. 111–23, title I, §103, May 22, 2009, 123 Stat. 1715, which authorized the Secretary of Defense to designate a senior official as responsible for performance assessments and root cause analyses for major defense acquisition programs, was transferred to chapter 144 of this title and redesignated as section 2438 by Pub. L. 111–383, div. A, title IX, §901(d), Jan. 7, 2011, 124 Stat. 4321.
Acquisition Strategies To Ensure Competition Throughout the Lifecycle of Major Defense Acquisition Programs
Pub. L. 111–23, title II, §202, May 22, 2009, 123 Stat. 1720, as amended by Pub. L. 112–81, div. A, title VIII, §837, Dec. 31, 2011, 125 Stat. 1509; Pub. L. 112–239, div. A, title VIII, §825, Jan. 2, 2013, 126 Stat. 1833, provided that:
"(a)
"(1) measures to ensure competition, or the option of competition, at both the prime contract level and the subcontract level (at such tier or tiers as are appropriate) of such program throughout the life-cycle of such program as a means to improve contractor performance; and
"(2) adequate documentation of the rationale for the selection of the subcontract tier or tiers under paragraph (1).
"(b)
"(1) Competitive prototyping.
"(2) Dual-sourcing.
"(3) Unbundling of contracts.
"(4) Funding of next-generation prototype systems or subsystems.
"(5) Use of modular, open architectures to enable competition for upgrades.
"(6) Use of build-to-print approaches to enable production through multiple sources.
"(7) Acquisition of complete technical data packages.
"(8) Periodic competitions for subsystem upgrades.
"(9) Licensing of additional suppliers.
"(10) Periodic system or program reviews to address long-term competitive effects of program decisions.
"(c)
"(1) where appropriate, breaking out a major subsystem, conducting a separate competition for the subsystem, and providing the subsystem to the prime contractor as Government-furnished equipment;
"(2) requiring prime contractors to give full and fair consideration to qualified sources other than the prime contractor for the development or construction of major subsystems and components of major weapon systems;
"(3) providing for government surveillance of the process by which prime contractors consider such sources and determine whether to conduct such development or construction in-house or through a subcontract; and
"(4) providing for the assessment of the extent to which a contractor has given full and fair consideration to qualified sources other than the contractor in sourcing decisions as a part of past performance evaluations.
"(d)
"(e)
"(1)
"(2)
Prototyping Requirements for Major Defense Acquisition Programs
Pub. L. 111–23, title II, §203, May 22, 2009, 123 Stat. 1722, as amended by Pub. L. 111–383, div. A, title VIII, §813(b), Jan. 7, 2011, 124 Stat. 4265, which directed the Secretary of Defense to make certain modifications to Department of Defense guidelines related to competitive prototyping for major defense acquisition programs and waivers, was repealed by Pub. L. 114–92, div. A, title VIII, §822(b), Nov. 25, 2015, 129 Stat. 902.
Organizational Conflicts of Interest in Major Defense Acquisition Programs
Pub. L. 111–23, title II, §207(a)–(c), May 22, 2009, 123 Stat. 1728, 1729, directed the Secretary of Defense to revise, not later than 270 days after May 22, 2009, the Defense Supplement to the Federal Acquisition Regulation to provide uniform guidance and tighten existing requirements for organizational conflicts of interest by contractors in major defense acquisition programs and directed the Panel on Contracting Integrity established pursuant to former section 813 of Pub. L. 109–364 (10 U.S.C. 2304 note) to present recommendations on measures to eliminate or mitigate organizational conflicts of interest in major defense acquisition programs.
Configuration Steering Boards for Cost Control Under Major Defense Acquisition Programs
Pub. L. 110–417, [div. A], title VIII, §814, Oct. 14, 2008, 122 Stat. 4528, as amended by Pub. L. 114–92, div. A, title VIII, §830, Nov. 25, 2015, 129 Stat. 912; Pub. L. 115–91, div. A, title VIII, §826, Dec. 12, 2017, 131 Stat. 1467; Pub. L. 116–92, div. A, title IX, §902(67), Dec. 20, 2019, 133 Stat. 1550, provided that:
"(a)
"(b)
"(1)
"(2)
"(A) The Office of the Under Secretary of Defense for Research and Engineering.
"(B) The Office of the Under Secretary of Defense for Acquisition and Sustainment.
"(C) The Chief of Staff of the Armed Force concerned.
"(D) Other Armed Forces, as appropriate.
"(E) The Joint Staff.
"(F) The Comptroller of the military department concerned.
"(G) The military deputy to the service acquisition executive concerned.
"(H) The program executive officer for the major defense acquisition program concerned.
"(I) Other senior representatives of the Office of the Secretary of Defense and the military department concerned, as appropriate.
"(c)
"(1)
"(A) Monitoring changes in program requirements and ensuring the Chief of Staff of the Armed Force concerned, in consultation with the Secretary of the military department concerned, approves of any proposed changes that could have an adverse effect on program cost or schedule.
"(B) Preventing unnecessary changes to program requirements and system configuration that could have an adverse impact on program cost or schedule.
"(C) Mitigating the adverse cost and schedule impact of any changes to program requirements or system configuration that may be required.
"(D) Ensuring that the program delivers as much planned capability as possible, at or below the relevant program baseline.
"(2)
"(A) review and approve or disapprove any proposed changes to program requirements or system configuration that have the potential to adversely impact program cost or schedule; and
"(B) review and recommend proposals to reduce program requirements that have the potential to improve program cost or schedule in a manner consistent with program objectives.
"(3)
"(4)
"(A)
"(B)
"(5)
"(A) increase the cost (including any increase for expected inflation or currency exchange rates) for system development and demonstration by more than 25 percent; or
"(B) extend the schedule for key events by more than 15 percent of the total number of months between the award of the system development and demonstration contract and the scheduled Milestone C approval date,
unless the Under Secretary of Defense for Research and Engineering and the Under Secretary of Defense for Acquisition and Sustainment jointly certify to the congressional defense committees [Committees on Armed Services and Appropriations of the Senate and the House of Representatives], and include in the certification supporting rationale, that approving such alteration to program requirements or system configuration is in the best interest of the Department of Defense despite the cost and schedule impacts to system development and demonstration of such program.
"(d)
"(1)
"(2)
"(e)
"(1) [Amended section 853(d)(2) of Pub. L. 109–364, set out below.]
"(2)
"(f)
Preservation of Tooling for Major Defense Acquisition Programs
Pub. L. 110–417, [div. A], title VIII, §815, Oct. 14, 2008, 122 Stat. 4530, directed the Secretary of Defense to issue, not later than 270 days after Oct. 14, 2008, guidance requiring the preservation and storage of unique tooling associated with the production of hardware for a major defense acquisition program through the end of the service life of the end item associated with such a program.
Duties of Principal Military Deputies
Pub. L. 110–181, div. A, title IX, §908(d), Jan. 28, 2008, 122 Stat. 278, as amended by Pub. L. 114–92, div. A, title VIII, §802(c), Nov. 25, 2015, 129 Stat. 879, provided that each Principal Military Deputy to a service acquisition executive has the responsibility to keep the Chief of Staff of the Armed Force concerned informed of the progress of and certain developments on major defense acquisition programs and to ensure program managers and program executive officers make certain considerations during the acquisition process.
Requirements Management Certification Training Program
Pub. L. 109–364, div. A, title VIII, §801, Oct. 17, 2006, 120 Stat. 2312, as amended by Pub. L. 116–92, div. A, title IX, §902(68), Dec. 20, 2019, 133 Stat. 1551, provided that:
"(a)
"(1)
"(2)
"(b)
"(c)
Program Manager Empowerment and Accountability
Pub. L. 109–364, div. A, title VIII, §853, Oct. 17, 2006, 120 Stat. 2342, as amended by Pub. L. 110–417, [div. A], title VIII, §814(e)(1), Oct. 14, 2008, 122 Stat. 4530, directed the Secretary of Defense to develop a comprehensive strategy for enhancing the role of Department of Defense program managers in developing and carrying out defense acquisition programs and to revise, not later than 180 days after Oct. 17, 2006, guidance for major defense acquisition programs to address the qualifications, resources, responsibilities, tenure, and accountability of program managers for both the program development period and the program execution period and provided for reports to Congress by the Secretary and the Comptroller General by not later than 270 days after Oct. 17, 2006, and one year after such date, respectively.
Management of National Security Agency Modernization Program
Pub. L. 108–136, div. A, title IX, §924, Nov. 24, 2003, 117 Stat. 1576, directed the Secretary of Defense to mandate that, effective Nov. 24, 2003, acquisitions under the National Security Agency Modernization Program be directed and managed by the Under Secretary of Defense for Acquisition, Technology, and Logistics.
Spiral Development Under Major Defense Acquisition Programs
Pub. L. 107–314, div. A, title VIII, §803, Dec. 2, 2002, 116 Stat. 2603, which authorized the Secretary of Defense to conduct major defense acquisition programs as spiral development programs and set out limitations on and requirements for such programs, was repealed by Pub. L. 114–92, div. A, title VIII, §821(b)(2), Nov. 25, 2015, 129 Stat. 900.
Environmental Consequence Analysis of Major Defense Acquisition Programs
Pub. L. 103–337, div. A, title VIII, §815, Oct. 5, 1994, 108 Stat. 2819, directed the Secretary of Defense to issue guidance, before Apr. 1, 1995, on how to achieve the purposes and intent of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) by ensuring timely compliance for major defense acquisition programs and how to analyze, as early in the process as feasible, the life-cycle environmental costs for such major defense acquisition programs, directed the Secretary to analyze, beginning not later than Mar. 31, 1995, the environmental costs of a major defense acquisition process as an integral part of the life-cycle cost analysis of the program, and directed the Secretary to establish a data base for documents prepared by the Department of Defense in complying with the National Environmental Policy Act of 1969 with respect to major defense acquisition programs.
Efficient Contracting Processes
Pub. L. 103–160, div. A, title VIII, §837, Nov. 30, 1993, 107 Stat. 1718, as amended by Pub. L. 103–355, title V, §5064(b)(2), Oct. 13, 1994, 108 Stat. 3360, directed the Secretary of Defense to waive regulations not required by statute that affect the efficiency of the contracting process within the Department of Defense.
Contract Administration: Performance Based Contract Management
Pub. L. 103–160, div. A, title VIII, §838, Nov. 30, 1993, 107 Stat. 1718, as amended by Pub. L. 103–355, title V, §5064(b)(3), Oct. 13, 1994, 108 Stat. 3360, which required the Secretary of Defense to define payment milestones for certain defense acquisition programs, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(37), Aug. 13, 2018, 132 Stat. 1849.
Defense Acquisition Pilot Program
Pub. L. 104–201, div. A, title VIII, §803, Sept. 23, 1996, 110 Stat. 2604, as amended by Pub. L. 105–85, div. A, title VIII, §847(b)(2), Nov. 18, 1997, 111 Stat. 1845, which provided that the Secretary could waive sections 2399, 2432, and 2433 of this title, under certain conditions, for any defense acquisition program designated by the Secretary of Defense for participation in the defense acquisition pilot program, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(43), Aug. 13, 2018, 132 Stat. 1850.
Pub. L. 103–355, title V, §5064, Oct. 13, 1994, 108 Stat. 3359, as amended by Pub. L. 106–398, §1 [[div. A], title VIII, §801(a), (b)], Oct. 30, 2000, 114 Stat. 1654, 1654A–202, 1654A–203, which authorized the Secretary of Defense to designate certain defense acquisition programs for participation in the defense acquisition pilot program, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(42), Aug. 13, 2018, 132 Stat. 1850.
Pub. L. 103–337, div. A, title VIII, §819, Oct. 5, 1994, 108 Stat. 2822, which authorized the Secretary of Defense to designate certain defense acquisition programs for participation in the defense acquisition pilot program, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(41), Aug. 13, 2018, 132 Stat. 1850.
Pub. L. 103–160, div. A, title VIII, §833, Nov. 30, 1993, 107 Stat. 1716, as amended by Pub. L. 103–355, title V, §5064(b)(1), Oct. 13, 1994, 108 Stat. 3360, which related to the use of mission-oriented program management in the Defense Acquisition Pilot Program, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(39), Aug. 13, 2018, 132 Stat. 1849.
Pub. L. 103–160, div. A, title VIII, §835(b), Nov. 30, 1993, 107 Stat. 1717, which related to funding for Defense Acquisition Pilot Program, and authorized the Secretary of Defense to expend appropriated sums as necessary to carry out next phase of acquisition program cycle after Secretary determined that objective quantifiable performance expectations relating to execution of that phase had been identified, was repealed by Pub. L. 103–355, title V, §5002(b), Oct. 13, 1994, 108 Stat. 3350.
Pub. L. 103–160, div. A, title VIII, §839, Nov. 30, 1993, 107 Stat. 1718, which required the Secretary to collect and analyze specified information on contractor performance under the Defense Acquisition Pilot Program, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(40), Aug. 13, 2018, 132 Stat. 1849.
Pub. L. 101–510, div. A, title VIII, §809, Nov. 5, 1990, 104 Stat. 1593, as amended by Pub. L. 102–484, div. A, title VIII, §811, Oct. 23, 1992, 106 Stat. 2450; Pub. L. 103–160, div. A, title VIII, §832, Nov. 30, 1993, 107 Stat. 1715, which related to a pilot program to determine the potential for increasing the efficiency and effectiveness of the acquisition process in defense acquisition programs, was repealed by Pub. L. 115–232, div. A, title VIII, §812(b)(38), Aug. 13, 2018, 132 Stat. 1849.
Definitions
Pub. L. 111–23, §2, May 22, 2009, 123 Stat. 1704, provided that: "In this Act [see Short Title of 2009 Amendment note set out under section 101 of this title]:
"(1) The term 'congressional defense committees' has the meaning given that term in section 101(a)(16) of title 10, United States Code.
"(2) The term 'major defense acquisition program' has the meaning given that term in section 2430 of title 10, United States Code.
"(3) The term 'major weapon system' has the meaning given that term in section 2379(d) [probably means section 2379(f)] of title 10, United States Code."