30 CFR § 56.6301
Blasthole obstruction check
May 28, 2026
§ 56.6301 Blasthole obstruction check.
Before loading, blastholes shall be checked and, wherever possible, cleared of obstructions.
Before loading, blastholes shall be checked and, wherever possible, cleared of obstructions.