(a) Purpose and scope. This section sets forth the applicable State implementation plan for Georgia under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2018, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraph (c) and (d) of this section with EPA approval dates after October 1, 2018, for Georgia will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to October 1, 2018, for Georgia at the National Archives and Records Administration. For information on the availability of this material at NARA go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA Approved Georgia Regulations.
EPA Approved Georgia Regulations
State citation | Title/subject | State effective date | EPA approval date | Explanation |
---|---|---|---|---|
391-3-1-.01 | Definitions | 7/23/2018 | 11/22/2019, 84 FR 64427 | Except the first paragraph, sections (a)-(nn), (pp)-(ccc), (eee)-(jjj), (nnn)-(bbbb), (dddd)-(mmmm), (rrrr)-(ssss), approved on 12/4/2018 with a State-effective date of 7/20/2017; sections (ddd) and (cccc) - approved on 2/2/1996 with a State-effective date of 11/20/1994; (nnnn), approved on 1/5/2017 with a State-effective date of 8/14/2016; and sections (oooo)-(qqqq), which are not in the SIP. |
391-3-1-.02 | Provisions | |||
391-3-1-.02(1) | General Requirements | 3/20/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2) | Emission Standards | |||
391-3-1-.02(2)(a) | General Provisions | 8/1/2013 | 7/28/2017, 82 FR 35106 | Except for paragraph 391-3-1-.02(2)(a)1 (as approved on 3/16/2006). |
391-3-1-.02(2)(b) | Visible Emissions | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(c) | Incinerators | 7/23/2018 | 11/22/2019, 84 FR 64427 | |
391-3-1-.02(2)(d) | Fuel-burning Equipment | 7/20/2005 | 2/9/2009, 75 FR 6309 | |
391-3-1-.02(2)(e) | Particulate Emission from Manufacturing Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(f) | Normal Superphosphate Manufacturing Facilities | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(g) | Sulfur Dioxide | 7/17/2002 | 7/9/2003, 68 FR 40786 | |
391-3-1-.02(2)(h) | Portland Cement Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(i) | Nitric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(j) | Sulfuric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(k) | Particulate Emission from Asphaltic Concrete Hot Mix Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(n) | Fugitive Dust | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(p) | Particulate Emissions from Kaolin and Fuller's Earth Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(q) | Particulate Emissions from Cotton Gins | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(r) | Particulate Emissions from Granular and Mixed Fertilizer Manufacturing Units | 1/27/1972 | 5/31/1972, 37 FR 10842 | |
391-3-1-.02(2)(t) | VOC Emissions from Automobile and Light Duty Truck Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(u) | VOC Emissions from Can Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(v) | VOC Emissions from Coil Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(w) | VOC Emissions from Paper Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(x) | VOC Emissions from Fabric and Vinyl Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(y) | VOC Emissions from Metal Furniture Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(z) | VOC Emissions from Large Appliance Surface Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(aa) | VOC Emissions from Wire Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(bb) | Petroleum Liquid Storage | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(cc) | Bulk Gasoline Terminals | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(dd) | Cutback Asphalt | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(ee) | Petroleum Refinery | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(ff) | Solvent Metal Cleaning | 5/29/1996 | 4/26/1999, 64 FR 20186 | |
391-3-1-.02(2)(gg) | Kraft Pulp Mills | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(hh) | Petroleum Refinery Equipment Leaks | 6/24/1994 | 2/2/1996, 61 FR 3817 | |
391-3-1-.02(2)(ii) | VOC Emissions from Surface Coating of Miscellaneous Metal Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(jj) | VOC Emissions from Surface Coating of Flat Wood Paneling | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(kk) | VOC Emissions from Synthesized Pharmaceutical Manufacturing | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(ll) | VOC Emissions from the Manufacture of Pneumatic Rubber Tires | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(mm) | VOC Emissions from Graphic Arts Systems | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(nn) | VOC Emissions from External Floating Roof Tanks | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(oo) | Fiberglass Insulation Manufacturing Plants | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(pp) | Bulk Gasoline Plants | 6/8/2008 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(qq) | VOC Emissions from Large Petroleum Dry Cleaners | 4/3/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(rr) | Gasoline Dispensing Facilities—Stage I | 6/8/2008 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(ss) | Gasoline Transport Systems and Vapor Collection Systems | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(tt) | VOC Emissions from Major Sources | 6/8/2008 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(uu) | Visibility Protection | 10/31/1985 | 1/28/1986, 51 FR 3466 | |
391-3-1-.02(2)(vv) | Volatile Organic Liquid Handling and Storage | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(yy) | Emissions of Nitrogen Oxides from Major Sources | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(ccc). | VOC Emissions from Bulk Mixing Tanks | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(ddd) | VOC Emissions from Offset Lithography and Letterpress | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(eee) | VOC Emissions from expanded Polystyrene Products Manufacturing | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(fff) | Particulate Matter Emissions from Yarn Spinning Operations | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(2)(hhh) | Wood Furniture Finishing and Cleaning Operations | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(jjj) | NOX Emissions from Electric Utility Steam Generating Units | 3/12/2007 | 11/27/2009, 74 FR 62249 | |
391-3-1-.02(2)(kkk) | VOC Emissions from Aerospace Manufacturing and Rework Facilities | 2/17/2019 | 3/11/2020, 85 FR 14145 | |
391-3-1-.02(2)(lll) | NOX Emissions from Fuel-burning Equipment | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(mmm) | NOX Emissions from Stationary Gas Turbines and Stationary Engines used to Generate Electricity | 5/4/2014 | 9/1/2015, 80 FR 52627 | |
391-3-1-.02(2)(nnn) | NOX Emissions from Large Stationary Gas Turbines | 2/16/2000 | 7/10/2001, 66 FR 35906 | |
391-3-1-.02(2)(rrr) | NOX Emissions from Small Fuel-Burning Equipment | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(vvv) | VOC Emissions from Coating Miscellaneous Plastic Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(yyy) | VOC Emissions from the use of Miscellaneous Industrial Adhesives | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(zzz) | VOC Emissions from Fiberglass Boat Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(aaaa) | Industrial Cleaning Solvents | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(3) | Sampling | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(4) | Ambient Air Standards | 7/23/2018 | 10/29/2019, 84 FR 57824 | Except paragraphs (a), (c), (d), (e), (f), (g), and (h), approved on 12/4/2018 with a State-effective date of 7/20/2017. |
391-3-1-.02(5) | Open Burning | 7/13/2006 | 2/9/2010, 75 FR 6309 | |
391-3-1-.02(6) | Source Monitoring | 8/1/2013 | 7/28/2017, 82 FR 35108 | |
391-3-1-.02(7) | Prevention of Significant Deterioration of Air Quality (PSD) | 7/20/2017 | 12/14/2018, 83 FR 64285 | Except for the automatic rescission clause at 391-3-1-.02(7)(a)(2)(iv), which EPA disapproved on March 4, 2016. Except for portions of Rule 391-3-1-.02(7) incorporating by reference 40 CFR 52.21(b)(1)(i)(a), 40 CFR 52.21(b)(1)(iii)(t), 40 CFR 52.21(b)(2)(v), and 40 CFR 52.21(b)(3)(iii)(c), because those CFR provisions were indefinitely stayed by the Fugitive Emissions Rule in the March 30, 2011 rulemaking and have not been approved into the Georgia SIP. Except for portions of Rule 391-3-1-.02(7) incorporating by reference the exemption of ethanol production facilities that produce ethanol by natural fermentation from the requirement to include fugitive emissions in determining major source applicability at 40 CFR 52.21(b)(1)(i)(a) and 40 CFR 52.21(b)(1)(iii)(t). Those provisions have not been approved into the Georgia SIP. |
391-3-1-.02(11) | Compliance Assurance Monitoring | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(12) | Cross State Air Pollution Rule NOX Annual Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.02(13) | Cross State Air Pollution Rule SO2 Annual Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.02(14) | Cross State Air Pollution Rule NOX Ozone Season Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.03 | Permits | |||
391-3-1-.03(1) | Construction (SIP) Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | |
391-3-1-.03(2) | Operating (SIP) Permit | 12/26/2001 | 7/11/2002, 67 FR 45909 | Except subparagraph (e), which is not approved into the SIP. |
391-3-1-.03(3) | Revocation, Suspension, Modification or Amendment of Permits | 2/23/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.03(4) | Permits not Transferable | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.03(5) | Permits Public Records | 10/28/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.03(6) | Exemptions | 8/9/2012 | 4/9/2013, 78 FR 21065 | |
391-3-1-.03(7) | Combined Permits and Applications | 2/23/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.03(8) | Permit Requirements | 6/18/2018 | 1/16/2020, 85 FR 2646 | Except paragraph (e), approved on 11/22/10 with a state-effective date of 7/25/07. |
391-3-1-.03(11) | Permit by Rule | 7/23/2018 | 11/22/2019, 84 FR 64427 | Except sections (a)-(b)(5) and (b)(7)-(b)(10), approved on 2/9/2010 with a State-effective date of 7/20/2005; section (b)(6), approved on 3/13/2000 with a State-effective date of 12/25/1997; and the phrase “or enforceable as a practical matter” in section .03(11)(b)11.(i), which is not in the SIP. |
391-3-1-.03(12) | Generic Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | |
391-3-1-.03(13) | Emission Reduction Credits | 9/11/2008 | 3/14/2019, 84 FR 9240 | Except subparagraph 391-3-1-.03(13)(f), which was approved into the SIP with a state-effective date of 7/18/2001, and subparagraphs (b), (c), (e), (g), and (i), which were approved into the SIP with a state-effective date of 2/16/2000. |
391-3-1-.04 | Air Pollution Episodes | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.07 | Inspections and Investigations | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.08 | Confidentiality of information | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.09 | Enforcement | 11/22/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.10 | Continuance of Prior Rules | 11/22/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.15 | Georgia Transportation Conformity and Consultation Interagency Rule | 10/6/2010 | 6/15/2012, 77 FR 35866 | |
391-3-20 | Enhanced Inspection and Maintenance | 6/19/2014 | 4/10/2017, 82 FR 17128 |
(d) EPA-Approved State Source Specific Requirements
EPA Approved Georgia Source-Specific Requirements
Name of source | Permit No. | State effective date | EPA approval date | Comments |
---|---|---|---|---|
Georgia Power Plant Bowen | EPD-AQC-180 | 11/17/1980 | 8/17/1981, 46 FR 41498 | |
Georgia Power Plant Harllee Branch | 4911-117-6716-0 | 4/23/1980 | 5/5/1981, 46 FR 25092 | |
ITT Rayonier, Inc | 2631-151-7686-C | 11/4/1980 | 8/14/1981, 46 FR 41050 | |
Georgia Power Plant Bowen | EPD-AQC-163 | 5/16/1979 | 1/3/1980, 45 FR 781 | |
Union Camp | 2631-025-7379-0 | 12/18/1981 | 4/13/1982, 47 FR 15794 | |
Blue Bird Body Company | 3713-111-8601 | 1/27/1984 | 1/7/1985, 50 FR 765 | |
Plant McDonough | 4911-033-5037-0 conditions 10 through 22 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4838-0 conditions 19 through 32 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4839-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4840-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4841-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1321-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1322-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-6949 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1320-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1319-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant McDonough | 4911-033-6951 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Atlanta Gas Light Company | 4922-028-10902 conditions 20 and 21 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Atlanta Gas Light Company | 4922-031-10912 conditions 27 and 28 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Austell Box Board Corporation | 2631-033-11436 conditions 1 through 5 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Emory University | 8922-044-10094 conditions 19 through 26 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
General Motors Corporation | 3711-044-11453 conditions 1 through 6 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Georgia Proteins Company | 2077-058-11226 conditions 16 through 23 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Owens-Brockway Glass Container, Inc | 3221-060-10576 conditions 26 through 28 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Owens-Corning Fiberglass Corporation | 3296-060-10079 conditions 25 through 29 | 11/15/1994 | 3/18/1999, 64 FR 13348 |
(e) EPA-Approved Georgia non-regulatory provisions.
EPA-Approved Georgia Non-Regulatory Provisions
Name of nonregulatory SIP provision |
Applicable geographic or nonattainment area | State submittal date/effective date | EPA approval date | Explanation |
---|---|---|---|---|
High Occupancy Vehicle (HOV) lane on I-85 from Chamblee-Tucker Road to State Road 316. High Occupancy Toll (HOT) lane on I-85 from Chamblee-Tucker Road to State Road 316 | Atlanta Metropolitan Area | 11/15/1993 and amended on 6/17/1996 and 2/5/2010 | 3/18/1999, 4/26/1999 and 11/5/2009. | |
Clean Fuel Vehicles Revolving Loan Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Regional Commute Options Program and HOV Marketing Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
HOV lanes on I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Two Park and Ride Lots: Rockdale County-Sigman at I-20 and Douglas County-Chapel Hill at I-20 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
MARTA Express Bus routes (15 buses) | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Signal preemption for MARTA routes #15 and #23 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Improve and expand service on MARTA's existing routes in southeast DeKalb County | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Acquisition of clean fuel buses for MARTA and Cobb County Transit | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
ATMS/Incident Management Program on I-75/I-85 inside I-285 and northern ARC of I-285 between I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Upgrading, coordination and computerizing intersections | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
[Reserved] | ||||
Atlantic Steel Transportation Control Measure | Atlanta Metropolitan Area | 3/29/2000 | 8/28/2000. | |
Procedures for Testing and Monitoring Sources of Air Pollutants | Atlanta Metropolitan Area | 7/31/2000 | 7/10/2001. | |
Enhanced Inspection/Maintenance Test Equipment, Procedures and Specifications | Atlanta Metropolitan Area | 9/20/2000 | 7/10/2001. | |
Preemption Waiver Request for Low-RVP, Low-Sulfur Gasoline Under Air Quality Control Rule 391-3-1-.02(2)(bbb) | Atlanta Metropolitan Area | 5/31/2000 | 2/22/2002. | |
Technical Amendment to the Georgia Fuel Waiver Request of May 31, 2000 | Atlanta Metropolitan Area | 11/9/2001 | 2/22/2002. | |
Georgia's State Implementation Plan for the Atlanta Ozone Nonattainment Area | Atlanta Metropolitan Area | 7/17/2001 | 5/7/2002. | |
Post-1999 Rate of Progress Plan | Atlanta Metropolitan Area | 12/24/2003 | 7/19/2004, 69 FR 42884. | |
Severe Area Vehicle Miles Traveled (VMT SIP) for the Atlanta 1-hour severe ozone nonattainment area | Atlanta 1-hour ozone severe nonattainment area | 6/30/2004 | 6/14/2005, 70 FR 34358. | |
Atlanta 1-hour ozone attainment area 2015 maintenance plan | Atlanta severe 1-hour ozone maintenance area | 2/1/2005 | 6/14/2005, 70 FR 34660. | |
Attainment Demonstration for the Chattanooga Early Action Area | Walker and Catoosa Counties | 12/31/2004 | 8/26/2005, 70 FR 50199. | |
Attainment Demonstration for the Lower Savannah-Augusta Early Action Compact Area | Columbia and Richmond Counties | 12/31/04 | 8/26/05, 70 FR 50195. | |
Alternative Fuel Refueling Station/Park and Ride Transportation Center, Project DO-AR-211 is removed | Douglas County, GA | 9/19/2006 | 11/28/2006, 71 FR 68743. | |
Macon 8-hour Ozone Maintenance Plan | Macon, GA encompassing a portion of Monroe County | 6/15/2007 | 9/19/2007, 72 FR 53432. | |
Murray County 8-hour Ozone Maintenance Plan | Murray County | 6/15/2007 | 10/16/2007, 72 FR 58538. | |
Atlanta Early Progress Plan | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton counties | 1/12/2007 | 2/20/2008, 73 FR 9206. | |
Rome; 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Floyd County | 10/27/2009 | 1/12/12, 77 FR 1873. | |
Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory | Catoosa and Walker Counties | 10/27/09 | 2/8/12; 77 FR 6467. | |
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 10/13/2007 | 2/6/2012, 77 FR 5706. | |
Atlanta 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 7/6/2010 | 3/1/2012, 77 FR 12487. | |
Macon 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Bibb County and Monroe County | 8/17/2009 | 3/2/2012, 77 FR 12724. | |
Atlanta 1997 8-Hour Ozone 2002 Base-Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties | 10/21/2009 | 4/24/2012, 77 FR 24399. | |
Regional Haze Plan | Statewide | 2/11/10 | 6/28/12, 77 FR 38501. | |
Regional Haze Plan Supplement (including BART and Reasonable Progress emissions limits) | Statewide | 11/19/10 | 6/28/12, 77 FR 38501. | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). |
Negative Declaration for Control of VOC Emissions from Reactor Processes and Distillation Operations in Synthetic Organic Chemical Manufacturing Industry (SOCMI) EPA-450/4-91-031, August 1993 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Emissions from Equipment Leaks from Natural Gas/Gasoline Processing Plants EPA-450/3-83-007, December 1983 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Leaks from Synthetic Organic Chemical Polymer and Resin Manufacturing Equipment EPA-450/3-83-006, March 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Emissions from Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry (SOCMI), EPA-450/3-84-015, December 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 10/21/2009 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
1997 8-Hour Ozone Reasonable Further Progress Plan for the Atlanta Area | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 11/4/2013. | |
1997 8-hour ozone Maintenance Plan for the Atlanta Area | Atlanta 1997 8-Hour Ozone Nonattainment Area | 4/4/2012 | 12/2/2013 | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
1997 Annual PM2.5 Maintenance Plan for the Macon Area | Bibb County and a portion of Monroe County, Macon, Georgia Nonattainment Area | 6/21/12 | 5/13/14, 79 FR 27193 | |
1997 Annual PM2.5 Maintenance Plan for the Rome Area | Floyd County, Rome, Georgia Area | 6/21/12 | 5/14/2014, 79 FR 27496 | |
1997 Annual PM2.5 Maintenance Plan for the Georgia portion of the Chattanooga TN-GA-AL Area | Catoosa and Walker Counties | 9/14/2012 | 12/19/2014, 79 FR 75748 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | Georgia | 5/14/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS | Georgia | 3/6/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS | Georgia | 3/25/2013 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
Offset measures associated with the repeal of Georgia Rules 391-3-1-.02(2)(aaa) and 391-3-1-.02(2)(bbb) and the revision to Georgia Rule 391-3-1-.02(2)(mmm) | Banks, Barrow, Bartow, Butts, Carroll, Chattooga, Cherokee, Clarke, Clayton, Cobb, Coweta, Dawson, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gordon, Gwinnett, Hall, Haralson, Heard, Henry, Jackson, Jasper, Jones, Lamar, Lumpkin, Madison, Meriwether, Monroe, Morgan, Newton, Oconee, Paulding, Pickens, Pike, Polk, Putnam, Rockdale, Spalding, Troup, Walton and Upson | 5/4/2014 | 9/1/2015, 80 FR 52627 | Includes the contingency offset measure in the event that the locomotive conversion program cannot be fully completed. |
Atlanta 2008 8-hour Ozone Marginal Area Requirements | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 8/11/2015, 80 FR 48041 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | Georgia | 3/6/2012 | 10/5/2015 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 5/14/2012 | 10/9/2015, 80 FR 61109 | With the exception of sections: 110(a)(2)(C), (D)(i)(II) prong 3 and (J) concerning PSD permitting requirements and 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) concerning interstate transport requirements. |
1997 Annual PM2.5 Maintenance Plan for the Atlanta Area | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 8/30/2012 | 2/24/2016, 81 FR 9114 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 National Ambient Air Quality Standard | Georgia | 10/22/2013 | 4/28/2016, 81 FR 25355 | With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAASQ | Georgia | 3/25/2013 | 9/14/2016 | With the exception of sections 110(a)(2)(C), prong 3 of D(i), and (J) and sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 11/21/2016, 81 FR 83154 | With the exception of sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4). |
2008 8-hour ozone NAAQS Nonattainment New Source Review Requirements for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 3/22/2017, 82 FR 14611 | |
2008 8-hour ozone Maintenance Plan for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding and Rockdale Counties | 7/18/2016 | 6/2/2017, 82 FR 25523 | |
January 2014 Regional Haze Progress Report | Georgia | 1/8/2014 | 10/4/2017, 82 FR 46136 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | Georgia | 3/25/2013 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | Georgia | 7/25/2014 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS | Georgia | 5/14/2012 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
Regional Haze Plan Revision | Georgia | 7/26/2017 | 5/4/2018, 83 FR 19637 | |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 9/25/2018, 83 FR 48387 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
Non-Interference Demonstration and Maintenance Plan Revision for Federal Low-Reid Vapor Pressure Requirement in the Atlanta Area | Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale counties | 8/15/2018 | 4/23/2019, 84 FR 16786 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | Georgia | 7/24/2018 | 5/17/2019, 84 FR 22374 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | Georgia | 8/15/2018 | 9/26/2019, 84 FR 50758 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/24/2018 | 3/11/2020, 85 FR 14147 | With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2) and PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J). |
[64 FR 27701, May 21, 1999]