Specific authority, upon filing formal application (FCC Form 309) therefor, is required for any of the following changes:
(a) Change involving an increase or decrease in the power rating of the transmitters.
(b) A replacement of the transmitters as a whole.
(c) Change in the location of the transmitting antenna.
(d) Change in the power delivered to the antenna.
(e) Change in frequency control and/or modulation system.
(f) Change in direction or gain of antenna system.
Other changes, not specified above in this section, may be made at any time without the authority of the Commission: Provided, That the Commission shall be immediately notified thereof and such changes shall be shown in the next application for renewal of license.
(Secs. 4, 5, 303, 48 Stat., as amended, 1066, 1068, 1082 (47 U.S.C. 154, 155, 303))
[38 FR 18895, July 16, 1973, as amended at 44 FR 65765, Nov. 15, 1979. Redesignated at 70 FR 46677, Aug. 10, 2005, as amended at 82 FR 57882, Dec. 8, 2017]