(a) Multilateration LMS systems will be authorized on the following LMS sub-bands:

Open Table
LMS sub-band Forward link1
904.000-909.750 MHz 927.750-928.000 MHz.
919.750-921.750 MHz.2 927.500-927.750 MHz.
921.750-927.250 MHz 927.250-927.500 MHz.

1Forward links for LMS systems may also be contained within the LMS sub-band. However, the maximum allowable power in these sub-bands is 30 Watts ERP in accordance with §90.205(l).

2The frequency band 919.750-921.750 MHz is shared co-equally between multilateration and non-multilateration LMS systems.

(b) Non-multilateriation LMS systems will be authorized in the following frequency bands:

Open Table
LMS Sub-band1
902.000-904.000 MHz
909.750-921.750 MHz

1Applicants for non-multilateration LMS systems should request only the minimum amount of bandwidth necessary to meet their operational needs.

[72 FR 35198, June 27, 2007, as amended at 75 FR 19284, Apr. 14, 2010]


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.