Search returned 320226 results for "free fc coins xbox one Visit Buyfc26coins.com for latest FC 26 coins news..yEY9"
handicapped persons, to participate in the self-evaluation process by submitting comments (both oral and written).
(c) The agency shall, until three years following the completion of the self-evaluation, maintain on file and make available for public inspections:
(1) A description of areas examined and any problems identified, and
(2) A description of any modifications made.
Act, prescribes procedures for the conduct of preemption hearings under section 306(b) of the Magnuson-Stevens Act, and collects the general provisions common to all domestic fisheries governed by this chapter.
(c) This part also governs fishing capacity reduction programs under the Magnuson-Stevens Act.
[61 FR 32540, June 24, 1996, as amended at 63 FR 7075, Feb. 12, 1998; 65 FR 31443, May 18, 2000]
In accordance with the framework procedures of the FMP for the Red Drum Fishery of the Gulf of Mexico, the RA may establish or modify the following items:
(a) Reporting and monitoring requirements, permitting requirements, bag and possession limits (including a bag limit of zero), size limits, vessel trip limits, closed seasons or areas and reopenings, annual catch limits (ACLs), annual catch targets (ACTs), quotas (including a quota
may begin fishing. Atlantic herring carrier vessels are not required to have VMS (See §648.10(m) for VMS notification requirements.).
[85 FR 26886, May 6, 2020]
, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff.
(c) Sensor systems shall include a warning indicator (or test circuit) which shows it is operative.
(d) Each fire-suppression system shall be equipped with a manually operated control valve which shall be independent of the sensor.
enclosed unless necessary to protect the health and safety of persons employed at the mine. Where such systems are enclosed, they shall be located in separate fireproof structures of heavy construction with explosion pressure release devices (such as hinged wall panels, window sashes, or louvers); which provide at least 1 square foot of area for each 80 cubic feet of space volume and which are distributed as uniformly as possible throughout the structure.
(a)
(1) Couplers that are used in medium- or high-voltage power circuits shall be of the three-phase type and enclosed in a full metallic shell, except that the Secretary may permit, under such guidelines as he may prescribe, no less effective couplers constructed of materials other than metal.
(2) Cable couplers shall be adequate for the intended current and voltage.
Where the Coal Mine Health and Safety District Manager has determined that the use of nonpermissible explosives and nonpermissible shot-firing units will not pose a hazard to any person during the development of a slope or shaft, he may, after written application by the operator, approve the use of such explosives and shot-firing units and issue a permit for the use of such explosives and devices setting forth the safeguards to be employed by the operator to protect
§90.203(b) are not permitted to collect respirable dust samples required by this part or handle approved sampling devices when being used in sampling.
(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in sampling procedures every three years.
(d) MSHA may revoke a person's certification for failing to properly carry out the required sampling
You must notify the appropriate BSEE District Manager when you successfully complete or recomplete a well for production. You must:
(a) Notify the District Manager within 5 working days of placing the well in a production status. You must confirm oral notification by telefax or e-mail within those 5 working days.
(b) Provide the following information in your notification:
(b) You must receive approval through the DWOP process (§§250.286 through 250.295) for production operations in HPHT environments known to contain H2S or in HPHT environments where the presence of H2S is unknown.
§250.1462, you may not contest your underlying liability for civil penalties.
(b) You must file your request within 10 days after you receive Notice of Civil Penalty with the Hearings Division (Departmental), Office of Hearings and Appeals, U.S. Department of the Interior, 801 North Quincy, Arlington, Virginia 22203.
(a) The Act authorizes the Secretary to prescribe such rules and regulations as may be necessary to carry out the provisions of the Act (43 U.S.C. 1334). The Secretary is authorized to prescribe and amend regulations that the Secretary determines to be necessary and proper in order to provide for the prevention of waste, conservation of the natural resources of the OCS
-bearing structure reaches total depth during the evaluation period and the data from that well is needed for the CID. You will receive written notification from the Regional Supervisor describing the additional information that is needed, and the evaluation period will resume once BOEM receives the requested information.
(c) The Regional Supervisor will approve or deny your CID request based on your commitment to develop economically producible reservoirs according to
(a) Any area of the OCS, which has been appropriately platted as provided in paragraph (b) of this section, may be leased for any mineral not included in an existing lease issued under the Act or meeting the requirements of subsection (a) of section 6 of the Act. Before any lease is offered or issued an area may be:
(1) Withdrawn from disposition pursuant to section 12(a) of the Act; or
(2
-insurance allowed, you must submit evidence of your net worth under §553.23 or evidence of your unencumbered assets under §553.26.
(c) You must identify a U.S. agent for service of process.
(a) Each bonding company that issues a surety bond that you submit to BOEM as OSFR evidence must:
(1) Be licensed to do business in the State in which the surety bond is executed;
(2) Be certified by the U.S. Treasury Department as an acceptable surety for Federal obligations and listed in the current Treasury Circular No. 570;
(3) Provide the surety bond on Form
any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Ocean Energy Management, 45600 Woodland Road, Sterling, VA 20166.
[76 FR 64623, Oct. 18, 2011, as amended at 80 FR 57097, Sept. 22, 2015. Redesignated at 81 FR 18175, Mar. 30, 2016]
, aquatic life, archaeological resources, or other uses of the area where you are prospecting or conducting scientific research activities.
(b) Consult and coordinate your G&G activities with other users of the area for navigation and safety purposes.
(c) If you conduct shallow test drilling or deep stratigraphic test drilling activities, you must use the best available and safest technologies that the Regional Director considers
(a) The Act authorizes the Secretary to prescribe such rules and regulations as may be necessary to carry out the provisions of the Act (43 U.S.C. 1334). The Secretary is authorized to prescribe and amend regulations that the Secretary determines to be necessary and proper in order to provide for the prevention of waste, conservation of the natural resources of the OCS
why it is in the lessor's or grantor's interest to approve the suspension.
(c) If you do not timely submit a SAP, COP, or GAP, as required, you may request a suspension to extend the preliminary or site assessment term of your lease or grant that includes a revised schedule for submission of a SAP, COP, or GAP, as appropriate.
(d) Any other information BOEM may require.
and conditions which require certification; and
(2) A statement identifying and describing any mitigation measures and monitoring methods, and their effectiveness. If you identified measures that were not effective, then you must make recommendations for new mitigation measures or monitoring methods.
(c) As provided at §585.105(i
(a) You must report all incidents listed in §585.831 to BOEM, according to the reporting requirements for these incidents in §§585.832 and 585.833.
(b) These reporting requirements apply to incidents that occur on the area covered by your
§764.21 is necessary to allow the regulatory authority to develop a data base and inventory system to evaluate whether reclamation is feasible in areas covered by petitions. The information required in §764.25(b) is necessary to allow the regulatory authority to determine, when a permit application is filed, whether it includes any areas designated as unsuitable for surface
(b) Each exploration hole, other drill hole or borehole, shaft, well, and other exposed underground opening which has been identified in the approved permit application for use to return underground development waste, coal processing waste or water to underground workings, or to be used to monitor ground water conditions, shall be temporarily sealed until actual use.
[44 FR 15422, Mar. 13, 1979, as amended at 81 FR 93418, Dec. 20
person who conducts auger mining operations shall leave areas of undisturbed coal, as approved by the regulatory authority, to provide access for future underground mining activities to coal reserves remaining after augering is completed, unless it is established that the coal reserves have been depleted or are so limited in thickness or extent that it will not be practicable to recover the remaining coal. This determination shall be made by the regulatory authority upon presentation of appropriate
Pursuant to 30 CFR 732.17(f)(1), North Dakota is required to submit to OSM by the specified date the following written, proposed program amendment, or a description of an amendment to be proposed that meets the requirements of SMCRA and 30 CFR Chapter VII and a timetable for enactment that is consistent with North Dakota's established administrative or legislative procedures.
(a)-(cc) [Reserved]
The Ohio State regulatory program as submtted on February 29, 1980, and resubmitted on January 22, 1982, is conditionally approved, effective August 16, 1982. Beginning on that date, the Department of Natural Resources shall be deemed the regulatory authority in Ohio for all surface coal mining and reclamation operations on non-Indian and non-Federal lands. Only surface coal mining and reclamation operations on non-Indian and non-Federal lands shall be subject to
On November 29, 1950 (15 FR 8585), a new lease form was adopted (Form 4-1158, 15 FR 8585) containing provisions whereby the lessee agrees that nothing in any contract or other arrangement made for the sale or disposal of oil, gas, natural gasoline, and other products of the leased land, shall be construed as modifying any of the provisions of the lease, including, but not limited to, provisions relating to gas waste, taking royalty-in-kind, and the method of computing royalties due as based
Department and in particular the provisions of 30 U.S.C. 1735; and
(2) That costs incurred by the State under the delegation of authority are eligible for reimbursement by the Department.
[49 FR 37351, Sept. 21, 1984. Redesignated at 49 FR 40025, Oct. 12, 1984]