42 U.S.C. § 16320
Verified against govinfo.gov as of June 20, 2026View official text on govinfo.gov ↗
- (a)In this section:
- (1)The term “SING” means the Spallation Neutron Source Instruments Next Generation major item of equipment.
- (2)The term “SNS power upgrade” means the Spallation Neutron Source power upgrade described in the 20-year facilities plan of the Office of Science of the Department.
- (3)The term “SNS second target station” means the Spallation Neutron Source second target station described in the 20-year facilities plan of the Office of Science of the Department.
- (4)The terms “Spallation Neutron Source Facility” and “Facility” mean the completed Spallation Neutron Source scientific user facility located at Oak Ridge National Laboratory, Oak Ridge, Tennessee.
- (5)The terms “Spallation Neutron Source Project” and “Project” means Department Project 99–E–334, Oak Ridge National Laboratory, Oak Ridge, Tennessee.
- (b)
- (c)
- (1)The Secretary shall develop an operational plan for the Spallation Neutron Source Facility that ensures that the Facility is employed to the full capability of the Facility in support of the study of advanced materials, nanoscience, and other missions of the Office of Science of the Department.
- (2)The operational plan shall—
- (A)include a plan for the operation of an effective scientific user program that—
- (i)is based on peer review of proposals submitted for use of the Facility;
- (ii)includes scientific and technical support to ensure that external users, including researchers based at institutions of higher education, are able to make full use of a variety of high quality scientific instruments; and
- (iii)phases in systems upgrades to ensure that the Facility remains at the forefront of international scientific endeavors in the field of the Facility throughout the operating life of the Facility;
- (B)include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and
- (C)address the status of and, to the maximum extent practicable, costs and schedules for—
- (A)include a plan for the operation of an effective scientific user program that—
- (d)
- (1)There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—
- (2)
- (A)Except as provided in subparagraph (B), there is authorized to be appropriated for the Spallation Neutron Source Facility for—
- (B)If stockpiles of heavy water of the Department are insufficient to meet the needs of the Facility, there is authorized to be appropriated for the Facility $12,000,000 for fiscal year 2007.