Part 257 — Criteria for Classification of Solid Waste Disposal Facilities and Practices
Subpart A — Classification of Solid Waste Disposal Facilities and Practices
- § 257.1— Scope and purpose.
- § 257.2— Definitions.
- § 257.3— Criteria for classification of solid waste disposal facilities and practices.
- § 257.3-1— Floodplains.
- § 257.3-2— Endangered species.
- § 257.3-3— Surface water.
- § 257.3-4— Ground water.
- § 257.3-5— Application to land used for the production of food-chain crops (interim final).
- § 257.3-6— Disease.
- § 257.3-7— Air.
- § 257.3-8— Safety.
- § 257.4— Effective date.
Subpart B — Disposal Standards for the Receipt of Very Small Quantity Generator (VSQG) Wastes at Non-Municipal Non-Hazardous Waste Disposal Units
- § 257.5— Disposal standards for owners/operators of non-municipal non-hazardous waste disposal units that receive Very Small Quantity Generator (VSQG) waste.
- § 257.8— Floodplains.
- § 257.9— Wetlands.
- § 257.13— Deadline for making demonstrations.
- § 257.21— Applicability.
- § 257.22— Ground-water monitoring systems.
- § 257.23— Ground-water sampling and analysis requirements.
- § 257.24— Detection monitoring program.
- § 257.25— Assessment monitoring program.
- § 257.26— Assessment of corrective measures.
- § 257.27— Selection of remedy.
- § 257.28— Implementation of the corrective action program.
- § 257.30— Recordkeeping requirements.
Subpart D — Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments
- § 257.50— Scope and purpose.
- § 257.52— Applicability of other regulations.
- § 257.53— Definitions.
- § 257.60— Placement above the uppermost aquifer.
- § 257.61— Wetlands.
- § 257.62— Fault areas.
- § 257.63— Seismic impact zones.
- § 257.64— Unstable areas.
- § 257.70— Design criteria for new CCR landfills and any lateral expansion of a CCR landfill.
- § 257.71— Liner design criteria for existing CCR surface impoundments.
- § 257.72— Liner design criteria for new CCR surface impoundments and any lateral expansion of a CCR surface impoundment.
- § 257.73— Structural integrity criteria for existing CCR surface impoundments.
- § 257.74— Structural integrity criteria for new CCR surface impoundments and any lateral expansion of a CCR surface impoundment.
- § 257.75— Requirements for identifying CCR management units.
- § 257.80— Air criteria.
- § 257.81— Run-on and run-off controls for CCR landfills.
- § 257.82— Hydrologic and hydraulic capacity requirements for CCR surface impoundments.
- § 257.83— Inspection requirements for CCR surface impoundments.
- § 257.84— Inspection requirements for CCR landfills.
- § 257.90— Applicability.
- § 257.91— Groundwater monitoring systems.
- § 257.93— Groundwater sampling and analysis requirements.
- § 257.94— Detection monitoring program.
- § 257.95— Assessment monitoring program.
- § 257.96— Assessment of corrective measures.
- § 257.97— Selection of remedy.
- § 257.98— Implementation of the corrective action program.
- § 257.100— Inactive CCR surface impoundments and Legacy CCR surface impoundments.
- § 257.101— Closure or retrofit of CCR units.
- § 257.102— Criteria for conducting the closure or retrofit of CCR units and closure of CCR management units.
- § 257.103— Alternative closure requirements.
- § 257.104— Post-closure care requirements.
- § 257.105— Recordkeeping requirements.
- § 257.106— Notification requirements.
- § 257.107— Publicly accessible internet site requirements.