Part 75 — Continuous Emission Monitoring
Subpart A — General
Subpart B — Monitoring Provisions
- § 75.10— General operating requirements.
- § 75.11— Specific provisions for monitoring SO<sub>2</sub> emissions.
- § 75.12— Specific provisions for monitoring NO<sub>X</sub> emission rate.
- § 75.13— Specific provisions for monitoring CO<sub>2</sub> emissions.
- § 75.14— Specific provisions for monitoring opacity.
- § 75.16— Special provisions for monitoring emissions from common, bypass, and multiple stacks for SO<sub>2</sub> emissions and heat input determinations.
- § 75.17— Specific provisions for monitoring emissions from common, bypass, and multiple stacks for NO<sub> X</sub> emission rate.
- § 75.18— Specific provisions for monitoring emissions from common and by-pass stacks for opacity.
- § 75.19— Optional SO<sub>2</sub>, NO<sub>X</sub>, and CO<sub>2</sub> emissions calculation for low mass emissions (LME) units.
Subpart C — Operation and Maintenance Requirements
Subpart D — Missing Data Substitution Procedures
- § 75.30— General provisions.
- § 75.31— Initial missing data procedures.
- § 75.32— Determination of monitor data availability for standard missing data procedures.
- § 75.33— Standard missing data procedures for SO<sub>2</sub>, NO<sub>X</sub>, and flow rate.
- § 75.34— Units with add-on emission controls.
- § 75.35— Missing data procedures for CO<sub>2</sub>..
- § 75.36— Missing data procedures for heat input rate determinations.
- § 75.37— Missing data procedures for moisture.
Subpart E — Alternative Monitoring Systems
- § 75.40— General demonstration requirements.
- § 75.41— Precision criteria.
- § 75.42— Reliability criteria.
- § 75.43— Accessibility criteria.
- § 75.44— Timeliness criteria.
- § 75.45— Daily quality assurance criteria.
- § 75.46— Missing data substitution criteria.
- § 75.47— Criteria for a class of affected units.
- § 75.48— Petition for an alternative monitoring system.
Subpart F — Recordkeeping Requirements
Subpart G — Reporting Requirements
- § 75.60— General provisions.
- § 75.61— Notifications.
- § 75.62— Monitoring plan submittals.
- § 75.63— Initial certification or recertification application.
- § 75.64— Quarterly reports.
- § 75.65— Opacity reports.
- § 75.66— Petitions to the Administrator.
- § 75.67— Retired units petitions.
- § 75.68— Temporary modifications to otherwise applicable quality-assurance requirements during the COVID-19 national emergency.
Subpart H — NO<sub>X</sub> Mass Emissions Provisions
- § 75.70— NO<sub>X</sub> mass emissions provisions.
- § 75.71— Specific provisions for monitoring NO<sub>X</sub> and heat input for the purpose of calculating NO<sub>X</sub> mass emissions.
- § 75.72— Determination of NO<sub>X</sub> mass emissions for common stack and multiple stack configurations.
- § 75.73— Recordkeeping and reporting.
- § 75.74— Annual and ozone season monitoring and reporting requirements.
- § 75.75— Additional ozone season calculation procedures.