40 CFR §86.516-90
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Calibrations shall be performed as specified in §§ 86.517 through 86.526.
- (b)[Reserved]
- (c)At least monthly or after any maintenance which could alter calibration, the following calibrations and checks shall be performed:
- (1)Calibrate the hydrocarbon analyzer, methane analyzer, carbon dioxide analyzer, carbon monoxide analyzer, and oxides of nitrogen analyzer (certain analyzers may require more frequent calibration depending on particular equipment and uses).
- (2)Calibrate the dynamometer. If the dynamometer receives a weekly performance check (and remains within calibration), the monthly calibration need not be performed.
- (3)Check the oxides of nitrogen converter efficiency.
- (d)At least weekly or after any maintenance which could alter calibration, the following calibrations and checks shall be performed:
- (e)The CVS positive displacement pump or Critical Flow Venturi shall be calibrated following initial installation, major maintenance or as necessary when indicated by the CVS system verification (described in § 86.519).
- (f)Sample conditioning columns, if used in the CO analyzer train, should be checked at a frequency consistent with observed column life or when the indicator of the column packing begins to show deterioration.