46 CFR §162.050-5
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)An application for approval of a separator, oil content meter, or a bilge alarm must contain the following information:
- (1)A brief description of the item submitted for approval.
- (2)The name and address of the applicant and its manufacturing facility.
- (3)A detailed description of quality control procedures, in-process and final inspections and tests followed in manufacturing the item, and construction and sales record keeping systems maintained.
- (4)Arrangement drawings and piping diagrams of the item that give the information prescribed by § 56.01-10(d) of this chapter.
- (5)Detailed electrical plans of the type described in § 110.25-1 of this chapter.
- (6)An operating and maintenance manual containing detailed and easily understandable instructions on installation, operation, calibration, zeroing, and maintenance of the item.
- (7)For each monitor and bilge alarm and each control on a separator, the vibration test report described in § 162.050-37.
- (8)For each oil content meter, a statement of whether it is to be used with crude oils, refined products, or both.
- (9)A list of the substances used in operating the item that require certification under part 147 of this chapter as articles of ships' stores and supplies.
- (10)The name of the facility to conduct approval testing.
- (11)If the applicant intends to use a test rig other than a test rig of the facility, a detailed description of the rig.
- (b)An applicant may incorporate by reference in his application information that he has submitted in a previous application.