As stated in §63.8826, you must comply with the applicable General Provisions requirements according to the following table:

Open Table
Citation Requirement Applies to subpart MMMMM Explanation
§63.1 Initial applicability determination; applicability after standard established; permit requirements; extensions; notifications Yes.
§63.2 Definitions Yes Additional definitions are found in §63.8830.
§63.3 Units and abbreviations Yes.
§63.4 Prohibited activities; compliance date; circumvention, severability Yes.
§63.5 Construction/reconstruction applicability; applications; approvals Yes.
§63.6(a) Compliance with standards and maintenance requirements-applicability Yes.
§63.6(b)(1)-(4) Compliance dates for new or reconstructed sources Yes §63.8786 specifies compliance dates.
§63.6(b)(5) Notification if commenced construction or reconstruction after proposal Yes.
§63.6(b)(6) [Reserved] Yes.
§63.6(b)(7) Compliance dates for new or reconstructed area sources that become major Yes §63.8786 specifies compliance dates.
§63.6(c)(1)-(2) Compliance dates for existing sources Yes §63.8786 specifies compliance dates.
§63.6(c)(3)-(4) [Reserved] Yes.
§63.6(c)(5) Compliance dates for existing area sources that become major Yes §63.8786 specifies compliance dates.
§63.6(d) [Reserved] Yes.
§63.6(e)(1) Operation and maintenance requirements Yes.
§63.6(e)(2) [Reserved] Yes.
§63.6(e)(3) Startup, shutdown, and malfunction plans Yes Only applies to new or reconstructed flame lamination affected sources.
§63.6(f)(1) Compliance except during SSM Yes Only applies to new or reconstructed flame lamination affected sources.
§63.6(f)(2)-(3) Methods for determining compliance Yes.
§63.6(g) Use of an alternative nonopacity emission standard Yes.
§63.6(h) Compliance with opacity/visible emission standards No Subpart MMMMM does not specify opacity or visible emission standards.
§63.6(i) Extension of compliance with emission standards Yes.
§63.6(j) Presidential compliance exemption Yes.
§63.7(a)(1)-(2) Performance test dates Yes Except for loop slitter affected sources as specified in §63.8798(a).
§63.7(a)(3) Administrator's section 114 authority to require a performance test Yes.
§63.7(b) Notification of performance test and rescheduling Yes.
§63.7(c) Quality assurance program and site-specific test plans Yes.
§63.7(d) Performance testing facilities Yes.
§63.7(e)(1) Conditions for conducting performance tests Yes.
§63.7(f) Use of an alternative test method Yes.
§63.7(g) Performance test data analysis, recordkeeping, and reporting Yes.
§63.7(h) Waiver of performance tests Yes.
§63.8(a)(1)-(2) Applicability of monitoring requirements Yes Unless otherwise specified, all of §63.8 applies only to new or reconstructed flame lamination sources. Additional monitoring requirements for these sources are found in §§63.8794(f) and (g) and 63.8804.
§63.8(a)(3) [Reserved] Yes.
§63.8(a)(4) Monitoring with flares No Subpart MMMMM does not refer directly or indirectly to §63.11.
§63.8(b) Conduct of monitoring and procedures when there are multiple effluents and multiple monitoring systems Yes.
§63.8(c)(1)-(3) Continuous monitoring system (CMS) operation and maintenance Yes Applies as modified by §63.8794(f) and (g).
§63.8(c)(4) Continuous monitoring system requirements during breakdown, out-of-control, repair, maintenance, and high-level calibration drifts Yes Applies as modified by §63.8794(g).
§63.8(c)(5) Continuous opacity monitoring system (COMS) minimum procedures No Subpart MMMMM does not have opacity or visible emission standards.
§63.8(c)(6) Zero and high level calibration checks Yes Applies as modified by §63.8794(f).
§63.8(c)(7)-(8) Out-of-control periods, including reporting Yes.
§63.8(d)-(e) Quality control program and CMS performance evaluation No Applies as modified by §63.8794(f) and (g).
§63.8(f)(1)-(5) Use of an alternative monitoring method Yes.
§63.8(f)(6) Alternative to relative accuracy test No Only applies to sources that use continuous emissions monitoring systems (CEMS).
§63.8(g) Data reduction Yes Applies as modified by §63.8794(g).
§63.9(a) Notification requirements—applicability Yes.
§63.9(b) Initial notifications Yes Except §63.8816(c) requires new or reconstructed affected sources to submit the application for construction or reconstruction required by §63.9(b)(1)(iii) in lieu of the initial notification.
§63.9(c) Request for compliance extension Yes.
§63.9(d) Notification that a new source is subject to special compliance requirements Yes.
§63.9(e) Notification of performance test Yes.
§63.9(f) Notification of visible emissions/opacity test No Subpart MMMMM does not have opacity or visible emission standards.
§63.9(g)(1) Additional CMS notifications—date of CMS performance evaluation Yes.
§63.9(g)(2) Use of COMS data No Subpart MMMMM does not require the use of COMS.
§63.9(g)(3) Alternative to relative accuracy testing No Applies only to sources with CEMS.
§63.9(h) Notification of compliance status Yes.
§63.9(i) Adjustment of submittal deadlines Yes.
§63.9(j) Change in previous information Yes.
§63.10(a) Recordkeeping/reporting applicability Yes.
§63.10(b)(1) General recordkeeping requirements Yes §§63.8820 and 63.8822 specify additional recordkeeping requirements.
§63.10(b)(2)(i)-(xi) Records related to startup, shutdown, and malfunction periods and CMS Yes Only applies to new or reconstructed flame lamination affected sources.
§63.10(b)(2)(xii) Records when under waiver Yes.
§63.10(b)(2)(xiii) Records when using alternative to relative accuracy test No Applies only to sources with CEMS.
§63.10(b)(2)(xiv) All documentation supporting initial notification and notification of compliance status Yes
§63.10(b)(3) Recordkeeping requirements for applicability determinations Yes.
§63.10(c) Additional recordkeeping requirements for sources with CMS Yes Applies as modified by §63.8794(g).
§63.10(d)(1) General reporting requirements Yes §63.8818 specifies additional reporting requirements.
§63.10(d)(2) Performance test results Yes
§63.10(d)(3) Opacity or visible emissions observations No Subpart MMMMM does not specify opacity or visible emission standards.
§63.10(d)(4) Progress reports for sources with compliance extensions Yes.
§63.10(d)(5) Startup, shutdown, and malfunction reports Yes Only applies to new or reconstructed flame lamination affected sources.
§63.10(e)(1) Additional CMS reports—general Yes Applies as modified by §63.8794(g).
§63.10(e)(2)(i) Results of CMS performance evaluations Yes Applies as modified by §63.8794(g).
§63.10(e)(2) Results of continuous opacity monitoring systems performance evaluations No Subpart MMMMM does require the use of COMS.
§63.10(e)(3) Excess emissions/CMS performance reports Yes Only applies to new or reconstructed flame lamination affected sources.
§63.10(e)(4) Continuous opacity monitoring system data reports No Subpart MMMMM does not require the use of COMS.
§63.10(f) Recordkeeping/reporting waiver Yes
§63.11. Control device requirements—applicability No Facilities subject to subpart MMMMM do not use flares as control devices.
§63.12 State authority and delegations Yes §63.8828 lists those sections of subparts MMMMM and A that are not delegated.
§63.13 Addresses Yes.
§63.14 Incorporation by reference Yes Subpart MMMMM does not incorporate any material by reference.
§63.15 Availability of information/confidentiality. Yes.