40 CFR Table 7
Applicability of General Provisions to Subpart MMMMM
June 9, 2020
As stated in §63.8826, you must comply with the applicable General Provisions requirements according to the following table:
Open Table
Citation | Requirement | Applies to subpart MMMMM | Explanation |
---|---|---|---|
§63.1 | Initial applicability determination; applicability after standard established; permit requirements; extensions; notifications | Yes. | |
§63.2 | Definitions | Yes | Additional definitions are found in §63.8830. |
§63.3 | Units and abbreviations | Yes. | |
§63.4 | Prohibited activities; compliance date; circumvention, severability | Yes. | |
§63.5 | Construction/reconstruction applicability; applications; approvals | Yes. | |
§63.6(a) | Compliance with standards and maintenance requirements-applicability | Yes. | |
§63.6(b)(1)-(4) | Compliance dates for new or reconstructed sources | Yes | §63.8786 specifies compliance dates. |
§63.6(b)(5) | Notification if commenced construction or reconstruction after proposal | Yes. | |
§63.6(b)(6) | [Reserved] | Yes. | |
§63.6(b)(7) | Compliance dates for new or reconstructed area sources that become major | Yes | §63.8786 specifies compliance dates. |
§63.6(c)(1)-(2) | Compliance dates for existing sources | Yes | §63.8786 specifies compliance dates. |
§63.6(c)(3)-(4) | [Reserved] | Yes. | |
§63.6(c)(5) | Compliance dates for existing area sources that become major | Yes | §63.8786 specifies compliance dates. |
§63.6(d) | [Reserved] | Yes. | |
§63.6(e)(1) | Operation and maintenance requirements | Yes. | |
§63.6(e)(2) | [Reserved] | Yes. | |
§63.6(e)(3) | Startup, shutdown, and malfunction plans | Yes | Only applies to new or reconstructed flame lamination affected sources. |
§63.6(f)(1) | Compliance except during SSM | Yes | Only applies to new or reconstructed flame lamination affected sources. |
§63.6(f)(2)-(3) | Methods for determining compliance | Yes. | |
§63.6(g) | Use of an alternative nonopacity emission standard | Yes. | |
§63.6(h) | Compliance with opacity/visible emission standards | No | Subpart MMMMM does not specify opacity or visible emission standards. |
§63.6(i) | Extension of compliance with emission standards | Yes. | |
§63.6(j) | Presidential compliance exemption | Yes. | |
§63.7(a)(1)-(2) | Performance test dates | Yes | Except for loop slitter affected sources as specified in §63.8798(a). |
§63.7(a)(3) | Administrator's section 114 authority to require a performance test | Yes. | |
§63.7(b) | Notification of performance test and rescheduling | Yes. | |
§63.7(c) | Quality assurance program and site-specific test plans | Yes. | |
§63.7(d) | Performance testing facilities | Yes. | |
§63.7(e)(1) | Conditions for conducting performance tests | Yes. | |
§63.7(f) | Use of an alternative test method | Yes. | |
§63.7(g) | Performance test data analysis, recordkeeping, and reporting | Yes. | |
§63.7(h) | Waiver of performance tests | Yes. | |
§63.8(a)(1)-(2) | Applicability of monitoring requirements | Yes | Unless otherwise specified, all of §63.8 applies only to new or reconstructed flame lamination sources. Additional monitoring requirements for these sources are found in §§63.8794(f) and (g) and 63.8804. |
§63.8(a)(3) | [Reserved] | Yes. | |
§63.8(a)(4) | Monitoring with flares | No | Subpart MMMMM does not refer directly or indirectly to §63.11. |
§63.8(b) | Conduct of monitoring and procedures when there are multiple effluents and multiple monitoring systems | Yes. | |
§63.8(c)(1)-(3) | Continuous monitoring system (CMS) operation and maintenance | Yes | Applies as modified by §63.8794(f) and (g). |
§63.8(c)(4) | Continuous monitoring system requirements during breakdown, out-of-control, repair, maintenance, and high-level calibration drifts | Yes | Applies as modified by §63.8794(g). |
§63.8(c)(5) | Continuous opacity monitoring system (COMS) minimum procedures | No | Subpart MMMMM does not have opacity or visible emission standards. |
§63.8(c)(6) | Zero and high level calibration checks | Yes | Applies as modified by §63.8794(f). |
§63.8(c)(7)-(8) | Out-of-control periods, including reporting | Yes. | |
§63.8(d)-(e) | Quality control program and CMS performance evaluation | No | Applies as modified by §63.8794(f) and (g). |
§63.8(f)(1)-(5) | Use of an alternative monitoring method | Yes. | |
§63.8(f)(6) | Alternative to relative accuracy test | No | Only applies to sources that use continuous emissions monitoring systems (CEMS). |
§63.8(g) | Data reduction | Yes | Applies as modified by §63.8794(g). |
§63.9(a) | Notification requirements—applicability | Yes. | |
§63.9(b) | Initial notifications | Yes | Except §63.8816(c) requires new or reconstructed affected sources to submit the application for construction or reconstruction required by §63.9(b)(1)(iii) in lieu of the initial notification. |
§63.9(c) | Request for compliance extension | Yes. | |
§63.9(d) | Notification that a new source is subject to special compliance requirements | Yes. | |
§63.9(e) | Notification of performance test | Yes. | |
§63.9(f) | Notification of visible emissions/opacity test | No | Subpart MMMMM does not have opacity or visible emission standards. |
§63.9(g)(1) | Additional CMS notifications—date of CMS performance evaluation | Yes. | |
§63.9(g)(2) | Use of COMS data | No | Subpart MMMMM does not require the use of COMS. |
§63.9(g)(3) | Alternative to relative accuracy testing | No | Applies only to sources with CEMS. |
§63.9(h) | Notification of compliance status | Yes. | |
§63.9(i) | Adjustment of submittal deadlines | Yes. | |
§63.9(j) | Change in previous information | Yes. | |
§63.10(a) | Recordkeeping/reporting applicability | Yes. | |
§63.10(b)(1) | General recordkeeping requirements | Yes | §§63.8820 and 63.8822 specify additional recordkeeping requirements. |
§63.10(b)(2)(i)-(xi) | Records related to startup, shutdown, and malfunction periods and CMS | Yes | Only applies to new or reconstructed flame lamination affected sources. |
§63.10(b)(2)(xii) | Records when under waiver | Yes. | |
§63.10(b)(2)(xiii) | Records when using alternative to relative accuracy test | No | Applies only to sources with CEMS. |
§63.10(b)(2)(xiv) | All documentation supporting initial notification and notification of compliance status | Yes | |
§63.10(b)(3) | Recordkeeping requirements for applicability determinations | Yes. | |
§63.10(c) | Additional recordkeeping requirements for sources with CMS | Yes | Applies as modified by §63.8794(g). |
§63.10(d)(1) | General reporting requirements | Yes | §63.8818 specifies additional reporting requirements. |
§63.10(d)(2) | Performance test results | Yes | |
§63.10(d)(3) | Opacity or visible emissions observations | No | Subpart MMMMM does not specify opacity or visible emission standards. |
§63.10(d)(4) | Progress reports for sources with compliance extensions | Yes. | |
§63.10(d)(5) | Startup, shutdown, and malfunction reports | Yes | Only applies to new or reconstructed flame lamination affected sources. |
§63.10(e)(1) | Additional CMS reports—general | Yes | Applies as modified by §63.8794(g). |
§63.10(e)(2)(i) | Results of CMS performance evaluations | Yes | Applies as modified by §63.8794(g). |
§63.10(e)(2) | Results of continuous opacity monitoring systems performance evaluations | No | Subpart MMMMM does require the use of COMS. |
§63.10(e)(3) | Excess emissions/CMS performance reports | Yes | Only applies to new or reconstructed flame lamination affected sources. |
§63.10(e)(4) | Continuous opacity monitoring system data reports | No | Subpart MMMMM does not require the use of COMS. |
§63.10(f) | Recordkeeping/reporting waiver | Yes | |
§63.11. | Control device requirements—applicability | No | Facilities subject to subpart MMMMM do not use flares as control devices. |
§63.12 | State authority and delegations | Yes | §63.8828 lists those sections of subparts MMMMM and A that are not delegated. |
§63.13 | Addresses | Yes. | |
§63.14 | Incorporation by reference | Yes | Subpart MMMMM does not incorporate any material by reference. |
§63.15 | Availability of information/confidentiality. | Yes. |