As required in §63.5580, you must submit the appropriate reports specified in the following table:

Open Table
You must submit a compliance report, which must contain the following information .  .  .   and you must submit the report .  .  .  
1. if there are no deviations from any emission limit, operating limit, or work practice standard during the reporting period, then the report must contain the information specified in §63.5580(c); semiannually as specified in §63.5580(b).
2. if there were no periods during which the CMS was out-of-control, then the report must contain a statement that there were no periods during which the CMS was out-of-control during the reporting period; you must develop and include specifications for out-of-control operation in the CMS quality control plan required under §63.8(d)(2);
3. if there is a deviation from any emission limit, operating limit, or work practice standard during the reporting period, then the report must contain the information specified in §63.5580(c) and (d);
4. if there were periods during which the CMS was out-of-control, then the report must contain the information specified in §63.5580(e);
5. if you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your SSM plan, then the report must contain the information specified in §63.10(d)(5)(i);
6. if you had a startup, shutdown, or malfunction during the reporting period and you took actions that are not consistent with your SSM plan, then the report must contain the information specified in §63.10(d)(5)(ii);
7. the report must contain any change in information already provided, as specified in §63.9(j);
8. for cellulose ether affected sources complying with the equipment leak requirements of subpart H of this part, the report must contain the information specified in §63.182(a)(3) and (6) and (d)(2) through (4);
9. for cellulose ether affected sources complying with the equipment leak requirements of subpart UU of this part, the report must contain the information specified in §63.1039(b);
10. for cellulose ether affected sources complying with the wastewater requirements of subparts F and G of this part, the report must contain the information specified in §§63.146(c) through (e) and 63.152(a)(4) and (5) and (c) through (e);
11. for affected sources complying with the closed-vent system provisions in §63.148, the report must contain the information specified in §63.148(j)(1);
12. for affected sources complying with the bypass line provisions in §63.148(f), the report must contain the information specified in §63.148(j)(2) and (3);
13. for affected sources invoking the delay of repair provisions in §63.104(e) for heat exchanger systems, the next compliance report must contain the information in §63.104(f)(2)(i) through (iv); if the leak remains unrepaired, the information must also be submitted in each subsequent compliance report until the repair of the leak is reported; and
14. for storage vessels subject to the emission limits and work practice standards in Table 1 to Subpart UUUU, the report must contain the periods of planned routine maintenance during which the control device does not comply with the emission limits or work practice standards in Table 1 to this subpart